POWER METER INSTALLATION
Installation
Activate terminating resistance and
configure current selector
1.
Set the RS485 switch into position T.
2.
Set the rotary switch between 1 and 7, depending on the
maximum current available on the connected circuit.
22
T T
NT
NT
RS485 5
RS48