POWER METER INSTALLATION
Installation
2. In the electrical panel box, locate a space for mounting the meter.
If possible, mount the meter inside the panel enclosure (box).
3. Add a protection for the meter in the electric box.
4. Wire the terminals N,1 and 2 from the meter to the neutral
and two hot lines from your electrical panel.
N
11
L1
L2
min: 0.2 mm
/AWG24
2
max: 2.5mm
/AWG12
2
N
1
13
14
15
16
≤ 0.45 Nm
2
3
17
18