Wallbox Power Boost Installation Manual page 16

Hide thumbs Also See for Power Boost:
Table of Contents

Advertisement

Available languages

Available languages

POWER METER INSTALLATION
Installation
9.1. Select GO.
9.2. On the Systems screen, scroll down to 2P and press
Enter.
9.3. Continue to the Ct rAt Menu
9.4. Press OK.
9.5. Set the Ct rAt value up to 50, so that it matches
with the 250 A clamps supplied.
9.6. The meter has been successfully configured.
16

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eco-smart

Table of Contents