POWER METER INSTALLATION
Installation
9.1. Select GO.
9.2. On the Systems screen, scroll down to 2P and press
Enter.
9.3. Continue to the Ct rAt Menu
9.4. Press OK.
9.5. Set the Ct rAt value up to 50, so that it matches
with the 250 A clamps supplied.
9.6. The meter has been successfully configured.
16