ELECTRICAL WIRING
ATTENTION:
Do not swap neutral and phase over, follow the diagram
shown carefully and carry out a good earth connection.
The section of the conductors must be at least 1mm². (Unless re-
quested otherwise by local standards and legislation).
The electrical wiring carried out by the installer must be in
compliance with the rules in force in the country.
CONTROL BOX, (see fig. 4)
To remove the control box (1) from the burner:
Unscrew the fissing screws on the burner cover and remove it.
Unscrew the fissing screws (2) on the plate and remove the
control box (1).
Screw the two fissing screws (2) and reassemble the burner
cover.
Fix the control box (1) with plate far from the burner.
TESTING
Check the shut-down of the burner by opening the thermostats.
D4677
5
GB
Key to lay-out
- Control box 531SE
A
- Capacitor
C
- Electrode
E
- Fuse
F
FR - P.E. Cell
- Lock-out signal
H
- Main switch
I
- Motor
M
PE - Burner-earth
- Heater
R
- Limit thermostat
TL
- Safety thermostat
TS
- Oil valve
Y
1
2
Fig. 4
20013743