Download Print this page

Gimenez Ganga PS-25 R Assembly Manual

Advertisement

Quick Links

PS-25 R
CUTTING AND ASSEMBLY MANUAL
ENG

Advertisement

loading
Need help?

Need help?

Do you have a question about the PS-25 R and is the answer not in the manual?

Questions and answers

Summary of Contents for Gimenez Ganga PS-25 R

  • Page 1 PS-25 R CUTTING AND ASSEMBLY MANUAL...
  • Page 3 INDEX CUTTING OF SLATS CURTAIN FABRICATION...
  • Page 4 CUTTING OF SLATS STEP 1 To ensure that all the perforations are aligned correctly on the curtain, insert the tool between the 4th and 5th perforations on the slats (Max. 5 slats).
  • Page 5 CUTTING AND ASSEMBLY MANUAL PS-25 R STEP 2 The cutting of the slats should be marked to ensure that the curtains are fabricated symmetrically. To do this we will need the number of perforations = L/145 mm, with L being the Length of the curtain, and we will round up the total.
  • Page 6 STEP 3 Support the slats and tool on the cutting machine pro- file to align the slats. Introduce a second tool to align them correctly and apply shrink film in the cutting are- as and intermediate areas to prevent the profiles from getting damaged during cutting.
  • Page 7 Washer DIN 125 A2 3.2 M3 507505 Dimensions in mm **As many PS-25 R sets of caps with screw code: 505059 will be installed as the total number of PS-25 R slats, except for the last slat inside the box. IMPORTANT...
  • Page 8 gimenezganga.com...