Download Print this page

Comprehensive Maintenance - BAC VTL Operating And Maintenance Instructions Manual

Advertisement

COMPREHENSIVE MAINTENANCE

About Comprehensive Maintenance
In order to ensure maximum efficiency and minimum downtime of
your evaporative cooling system, it is recommended to establish
and execute a programme of preventive maintenance. Your local
BAC Balticare representative will assist you in establishing and
implementing such programme. The preventive maintenance
programme must not only avoid that excessive downtime occurs
under unforeseen and unwanted conditions, but must also ensure
that factory authorized replacement parts are used, which are
designed to fit and for their purpose carry the full factory warranty.
Factory authorized replacement parts are available normally within
four days after receipt of an order. In emergency cases shipment
can be usually made within 24 hours. To order factory authorized
parts, contact your local BAC representative. Be sure you include the
unit serial number when ordering any parts.
To facilitate servicing of the equipment, it is suggested that the
following parts be carried on hand:
- Make-up float ball (if applicable)
- Valve seal for water make-up valve
- Fan shaft bearings
- Spray nozzles and grommets
- Spray distribution branch grommets
- Set of belts
Insist on factory authorised parts to avoid loss of efficiency or an
operational risk, which may occur when non authorised parts are
used.
10

Advertisement

loading

This manual is also suitable for:

VflVcl