Filter Installation; Field Installed Power Wiring; Main Unit Power - American Standard YSC036A Installation, Operation And Maintenance Manual

Packaged gas/electric 3-10 ton
Hide thumbs Also See for YSC036A:
Table of Contents

Advertisement

Figure 25.
Condensate trap
installation

Filter Installation

Each unit ships with one inch filters.
The quantity of filters is determined
by unit size. Access to the filters is
obtained by removing the indoor fan
access panel. To modify the unit's
filter rack to accept two inch filters,
remove the L-shaped angle
attachment screws and rotate the
angles 90 degrees.
Reinstall the screws and insert new
filters. Refer to the unit Service Facts
(shipped with each unit) for filter
requirements.
Note: Do not operate the unit
without filters.
Field Installed Power
Wiring
An overall dimensional layout for the
field installed wiring entrance into
the unit is illustrated in
"Unit
Dimensions, " p.
12. To insure that the
unit's supply power wiring is
properly sized and installed, follow
the following guidelines.
WARNING
Ground Wire!
All field-installed wiring must be
completed by qualified personal. All
field-installed wiring must comply
with NEC and applicable local codes,
failure codes. Failure to follow this
instruction could result in death or
serious injuries.
26
Verify that the power supply
available is compatible with the unit's
nameplate ratings. The available
supply power must be within 10% of
the rated voltage stamped on the
nameplate. Use only copper
conductors to connect the power
supply to the unit.
CAUTION
Equipment Damage!
Use copper conductors only. Unit
terminals are not designed to accept
other types of conductors. Failure to
use copper conductors may result in
equipment damage.
Note: If the unit is not equipped
with an optional factory
installed nonfused
disconnect switch or circuit
breaker, a field supplied
disconnect switch must be
installed at or near the unit in
accordance with the National
Electrical Code (NEC latest
edition).

Main Unit Power

Standard Wiring
1.
Location of the applicable
electrical service entrance is
illustrated in
"Unit Dimensions, "
p.
12. Complete the unit's power
wiring connections at
Compressor Contactor # 1 (CC1)
inside the unit control panel.
Refer to the customer connection
diagram that is shipped with the
unit for specific termination
points
2.
Provide proper grounding for the
unit in accordance with local and
national codes.
Main Unit Power
Optional TBUE Wiring
(Through the Base Electrical
Option)
1.
Location of the applicable
electrical service is illustrated
below. Refer to the customer
connection diagram that is
shipped with the unit for specific
termination points. The
termination points, depending
on the customer option selected
would be a factory mounted
nonfused disconnect switch
Installation
(UDC) or circuit breaker (UCB). If
neither a factory mounted
nonfused disconnect switch
(UDC) or circuit breaker (UCB)
was factory mounted, field
wiring connections should be
terminated in the control box at
Compressor Contactor # 1 (CC1).
2.
Provide proper grounding for the
unit in accordance with local and
national codes.
Note: Black Gasket is shipped from
the factory and is located in
the literature Ship With bag
in the control box. Apply
Black Gasket around conduit
plate on all 4 sides after
installation to prevent air
leakage from the building
entering the electrical
enclosures.
Note: Seal between wiring and
conduit with Black Gasket or
weather proof sealer to
prevent air leakage from the
building entering the
electrical enclosures. Also
seal around conduit and
wiring at all roof and curb
penetrations.
Figure 26.
Field Installed Control Wiring
An overall layout of the various
control options available with the
required number of conductors for
each control device is illustrated in
Figure 24, p.
25.
RT-SVX21F-EN

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents