Slant/Fin CARAVAN GGT-600E Application Manual page 9

Modular boilers
Table of Contents

Advertisement

Figure 9. Connector rise
Figure 10. Suggested venting system constructions
Connector Rise: Connector rise is the length of the pipe connecting the
top of the draft hood to the system breeching above. The diameter of this
pipe varies depending upon BTU input, chimney height and the length of
the connector. Fig.9 (Dim. "B") shows the location of this pipe in a typical
application. Table 2a depicts the proper diameter (Dim. "C") of the connec-
tor rise depending upon its total length (top of the draft hoods to the
breeching above).
Table 2A.
Vent Connector Diameters (20 ft. chimney "F" dim)
Flue Outlet Size
Model
"A"
GG300ES
8"
GG350HES
9"
10"
GG375HES
GG399HES
10"
Based on single row of modules with no elbows.
NOTE: For conditions other than those shown, consult factory, or National Fuel
Gas Code NFPA 54.
NOTE: "E" dimensions (from table 2), when designing breeching dia. is the
same as chimney dia.
9
Connector Rise "B"
3' High
2' High
1' High
"C"
"C"
"C"
8"
10"
10"
9"
10"
12"
10"
10"
12"
10"
12"
12"

Advertisement

Table of Contents
loading

Table of Contents