GALAXY II
INSTALLATION AND OPERATING INSTRUCTIONS
Models GXHII-95 through GXHII-155
CONTENTS .........................................................................PAGE
Dimensions............................ ......................................................2
Boiler Location........................................ ................................3
Boiler Foundation....................................................................3
Minimum Clearance.....................................................................3
Vent Piping..............................................................................4
Gas Piping............................................. ......................................4
Electrical Controls and Wiring.................... .................................8
Boiler Water Temperature Control........................................12-16
Water Piping............................................. .................................17
Protection from Freezing, Water Treatment .........................23
Keeping Area Clear ..............................................................23
Troubleshooting Guide................................ ..............................24
Piping a Heating and Cooling System.......................................26
Replacement Parts...................................... ..............................26
Appendix A ................................................................................26
Heating Contractor
Address
Phone Number
Printed in U.S.A. 0121
Part No. 41-2871000
GAS-FIRED CAST IRON BOILERS FOR
™
NATURAL AND L.P. PROPANE GASES
HOT WATER BOILERS
READ ALL OF THE FOLLOWING WARNINGS
AND STATEMENTS BEFORE READING THE
INSTALLATION INSTRUCTIONS
SEE "WARNING" ON PAGE 3 FOR LIQUEFIED PETROLE-
UM (L.P.) PROPANE GAS-FIRED BOILERS
The installation must conform to the requirements of the authority
having jurisdiction or, in the absence of such requirements,
to the National Fuel Gas Code, Z223.1/NFPA 54 -latest edition.
The installation must also conform to the additional requirements
in this Slant/Fin Instruction Book.
In addition, where required by the authority having jurisdiction,
the installation must conform to American Society of Mechanical
Engineers Safety Code for Controls and Safety Devices for
Automatically Fired Boilers, No. CSD-1.
This manual must be left with owner and should be hung on or
adjacent to the boiler for reference.
This boiler, gas piping and accessories must be installed, con-
nected, serviced and repaired by a trained, experienced service
technician, familiar with all precautions required for gas-fired
equipment and licensed or otherwise qualified, in compliance
with the authority having jurisdiction.
Boiler Model Number
Boiler Serial Number
Installation Date
IMPORTANT
WARNING
WARNING
PUBLICATION GXHII-42
Need help?
Do you have a question about the GALAXY II GXHII-95 and is the answer not in the manual?
Questions and answers