Download Print this page

Advertisement

Quick Links

33531U21QU Bed
1

Advertisement

loading
Need help?

Need help?

Do you have a question about the 33531U21QU and is the answer not in the manual?

Questions and answers

Summary of Contents for OVIS 33531U21QU

  • Page 1 33531U21QU Bed...
  • Page 2 Estimated Time for Assembly 25:00 - 35:00 Weight Limitation 450 lbs Tools Needed All necessary tools are included in the package. ( Phillips Screwdriver Not Included)
  • Page 3 PLEASE CONTACT US FOR QUESTIONS Email our support team: help@ovis.co CAUTION:...
  • Page 4 PLEASE CONTACT US FOR QUESTIONS Email our support team: help@ovis.co Bed Parts are shipped inside a compartment in the back of the headboard.
  • Page 5 PLEASE CONTACT US FOR QUESTIONS Email our support team: help@ovis.co Re m ove p a r t s f ro m h e a d b o a rd c o m p a r t m e n t...
  • Page 6: Package Content

    PACKAGE CONTENT CAUTION: DO NOT SLIDE BED AFTER ASSEMBLY. LIFT THE BED FRAME INTO ITS FINAL POSITION. ( L ) ( R ) QUEEN BED Components Hardware 1 pc ( L ) 1 set ( R ) 1 pc M8X20 M6X35 M6X50 M6X60...
  • Page 7 M6X50 6 pcs A ach “P” washers to “L” bolt. Connect the leg “B” to back of headboard “A”. Use the bolts to a ach. ( L ) ( R )
  • Page 9 8 pcs M8X20 ( R ) ( L ) Thread “J” bolts into the holes in the headboard and footboard. Do not ghten. These will be ghtened in later steps.
  • Page 10 M6X35 8 pcs A ach “O” washers to “K” bolt. Connect the top and bo om of each side rail with a “D” side leg. Use the bolts to a ach. Same assembly steps to the second set of side rail.
  • Page 11 Hang the hooks at the ends of the side rails onto the “J” bolts in the headboard leg and the footboard. Do not fully ghten the “J” bolts. The bolts will be ghtened in a later step. ( L ) ( R )
  • Page 12 4 pcs M6X60 A ach adjustable leveling feet to the bo om of leg “ H”. Then assemble the slat system by a aching the slats to the “I” supports and “H” legs. First, extend the slats. Then, line up the holes in the slats with the holes in the “I”...
  • Page 13 24 pcs M4X32 Then, adjust slat leveling feet on the bo om of leg “H” to a distance 1/2" above the floor. Floor line Leveling feet Then, use screwdriver to install“N” screws into side rail cleat Finally, ghten all “J” bolts. FINISH !
  • Page 14: For Additional Help

    FOR ADDITIONAL HELP: Email our support team: help@ovis.co THANK YOU FOR PURCHASING !