3.2.4
Checks when starting up the engine
Measure speed, oil pressure and charging pressure at various engine performances.
u
Measure the exhaust gas temperature before and after the turbine.
u
Measure the air temperature before and after the compressor.
u
Compare the measured values with the values of the acceptance report. Different operat-
u
ing conditions indicate a malfunction (see chapter
NOTICE
Escape of oily fluids
Lubricants and pastes used during assembly can liquefy or vaporise and es-
cape as oily fluids during the initial hours of operation. Continual escape of
an oily fluid indicates an oil leak.
If there is a leak, contact an ABB Turbocharging Service Station.
3.3

Commissioning after taking out of operation

If present
Remove cover plates (blind flanges) from the compressor casing, the gas inlet and the
u
gas outlet.
General
Check the exhaust gas pipe before and after the turbine for combustion residues or wa-
u
ter residues and clean it. Remove any foreign objects that may be present.
Check and clean filter silencer or air supply line, and remove any foreign objects that may
u
be present.
Put engine-side oil circulation to the turbocharger into operation.
u
Prepare the turbocharger for operation according to section "Checks before commission-
u
ing".
The turbocharger is now ready for operation.
u
© Copyright 2017 ABB. All rights reserved.
Troubleshooting
HZTL4034_EN
→45).
Revision K
June 2017

Advertisement

Table of Contents
loading

This manual is also suitable for:

A170-l37

Table of Contents