Contents This manual is for guidance on the use of the Carbolite Gero product specified on the front cover. This manual should be read thoroughly before unpacking and using the furnace or oven. The model details and serial number are shown on the back of this manual.
Page 3
Safe Operation of the Furnace General Operating Advice Operator Safety Tube Life Pressure Gas Tightness 5.0 Maintenance General Maintenance 5.1.1 Cleaning Calibration After-Sales Service Recommended Spare Parts and Spare Parts Kit 6.0 Repairs and Replacements Safety Warning - Disconnection from Power Supply Safety Warning - Refractory Fibre Insulation Temperature Controller Replacement Solid-state Relay Replacement...
1.0 Symbols and Warnings 1.0 Symbols and Warnings Switches and Lights Instrument switch: when the instrument switch is operated the temperature control circuit is energised. Heat light: the adjacent light glows or flashes to indicate that power is being supplied to the elements. Heat switch: the switch disconnects power to the heating elements;...
1.0 Symbols and Warnings Caution – Double Pole/Neutral Fusing Warning Labels On the front control panel there are 2 warning labels as shown in Figure 1.3.1; they are numbered 7 and 8. These warnings must be followed for the safe operation of this furnace.
1.0 Symbols and Warnings Index to numbered items in Figure 1.3.1 and 1.3.2 1. Electrical supply switch - switches electrical power ON and OFF to the furnace. 2. Heater switch - switches electrical power ON and OFF to the furnace heating elements.
If the product has been transported or stored in humid conditions it must be dried out completely before operating the furnace. Contact Carbolite Gero Service for instructions. Unpacking and Handling When unpacking or moving the product, always lift it by its base or both ends of the main body.
Page 8
2.0 Installation Position the vertical stand upright (2) on the stand base in line with the fixing holder. Secure the stand upright to the base using the 6 x M6 dome cap screws (4) and wash- ers (3) supplied. Partially screw in the top M6 screw knobs, 2 x (6) into the frame upright as shown in 2.3.3.
Page 9
2.0 Installation 2.3.1 Figure - Vertical tube furnace model 2.3.2 Figure - Assembling the mounted on its stand. stand. Index to numbered items in Figure 2.3.2 and Figure 2.3.3 1. Vertical stand base 2. Vertical stand upright 3. Fixing screws M6 x 16 dome cap screw 4.
Page 10
2.0 Installation Using the tube furnace horizontally The furnace can be used either with the stand vertically as shown in 2.3.3 or horizontally as shown in 2.3.4. To use horizontally simply tip the stand over into the horizontal position making sure that the flexible conduits are not trapped beneath the frame.
Page 11
2.0 Installation Fit tube support bracket, item 7, figure 2.2. Use supplied M6 button head screws and washers. Finally, fit tube support collar, (5) using item (6) until the tube is secure enough for use in a vertical arrangement. Fitting arrangement is shown in figure 2.2. Figure 2.2 - shows an exploded view of all the required parts.
Page 12
2.0 Installation 2.3.7 Figure - Tube support and end seal 2.3.8 Figure - Tube support and end seal assembly For extra stability of the tube, repeat the assembly instructions above (as shown in figure 2.3.82.3.9...
2.0 Installation 2.3.9 Figure - View showing how to support the work tube in a vertical orientation. Setting Up - Without a Stand Any of the E-range vertical furnaces can be supplied without a stand for either wall mounting (using wall bracket option) or installation in customer's test rig/mounting frame.
2.0 Installation 3. Connecting conduit between furnace and control box Fitting the Optional Insulation Plugs and Radiation Shield For optimum temperature uniformity, insulation plugs or radiation shields should be placed in the work tube ends as shown below. With a standard work tube, the stem (8) (see figure 2.4.2) of the insulation plug assembly lines up with the end of the work tube.
2.0 Installation Electrical Connections Connection by a qualified electrician is recommended. All furnaces in the range are single-phase and operate over the voltage ranges 100 to 110 volts or 200 - 240 volts. Check the rating label before connection, see "Warning Labels"...
4.0 Operation 4.0 Operation Operating Cycle This product is fitted with an instrument switch which cuts off power to the control circuit. Connect the product to the electrical supply. Turn on the instrument switch to activate the temperature controller. The controller illuminates and goes through a short test cycle.
4.0 Operation Explosive Materials The furnace must not be used to heat materials which could explode, or which could emit gases that could form explosive mixtures. If the safe heating of a material is dependent on its temperature, only heat these type of materials if the furnace has the optional over-temperature protection device fitted.
4.0 Operation Switch off the heater switch whenever loading or unloading the product. The elements are isolated when the heater switch is OFF. This switch cuts both sides of the circuit via a contactor. Tube Life A ceramic work tube may crack if work pieces are inserted too quickly or at temperatures below 900 °C (when the tube is more brittle).
Recommended Spare Parts and Spare Parts Kit Carbolite Gero can supply individual spare parts or a kit of the items most likely to be required. Ordering a kit in advance can save time in the event of a breakdown.
European Association representing the High Temperature Insulation Wool industry (www.ecfia.eu). Further information can be provided on request. Alternatively, Carbolite Gero Service can quote for any repairs to be carried out either on site or at the Carbolite Gero factory. Temperature Controller Replacement Refer to the controller instructions for more information on how to replace the temperature controller.
Individual elements are not available for this model of product, if an element fails then a complete element assembly is required. For details and fitting instructions contact Carbolite Gero Service, see the back page of this manual for contact information.
If any fuse has failed, it is advisable for an electrician to check the internal circuits. Replace any failed fuses with the correct type. For safety reasons do not fit larger capacity fuses without first consulting Carbolite Gero. The fuses are located at the cable entry point. Remove the back panel or control box...
7.0 Fault Analysis 7.0 Fault Analysis Furnace Does Not Heat Up The HEAT The heating element Check also that the SSR is working light is ON has failed correctly The controller shows a The HEAT The thermocouple has broken or has very high temperature light is OFF a wiring fault...
7.0 Fault Analysis Product Overheats Product only heats up The controller when the instrument shows a very high The controller is faulty switch is ON temperature The thermocouple may be The controller faulty or may have been shows a low removed out of the heating temperature chamber...
9.0 Fuses and Power Settings 9.0 Fuses and Power Settings Fuses F1 - F2: Refer to the circuit diagrams. GEC Safeclip of the type shown Fitted if supply cable fitted. Internal (glass type F up to 16 A) Supply Fitted on board to some types 38 mm x 10 mm type F fitted on Fuses of EMC filter.
9.0 Fuses and Power Settings 9.2 Power Settings The power limit settings (OP.Hi) for this model is as follows. The figures represent the maximum percentage of time that controlled power is supplied to the elements. Do not attempt to "improve performance" by setting a value higher than the one from the table.
0.750 EVT 12/150B 1200 Work tube adaptors, extended work tube supports, insulation plugs and gas/ vacuum end seals are available from Carbolite Gero for work tubes with outside diameters of 32 mm, 46 mm and 60 mm. 10.1 Environment The furnaces contain electrical parts and should be stored and used in indoor conditions...
If visible signs of moisture are present then allow it to dry out in ambient temperature for at least 24 hours. If the problem persists ensure that the furnace is isolated and contact Carbolite Gero Service for more information.
Page 33
Notes Service Record Engineer Name Date Record of Work...
Page 34
The products covered in this manual are only a small part of the wide range of ovens, chamber furnaces and tube furnaces manufactured by Carbolite Gero for laboratory and industrial use. For further details of our standard or custom built products please contact us at the address below, or ask your nearest stockist.
Need help?
Do you have a question about the EVT 12/150B and is the answer not in the manual?
Questions and answers