Sign In
Upload
Download
Table of Contents
Contents
Add to my manuals
Delete from my manuals
Share
URL of this page:
HTML Link:
Bookmark this page
Add
Manual will be automatically added to "My Manuals"
Print this page
×
Bookmark added
×
Added to my manuals
Manuals
Brands
Carbolite Gero Manuals
Furnace
ELF 11/14B
Installation, operation and maintenance instructions
Carbolite Gero ELF 11/14B Installation, Operation And Maintenance Instructions
1100 c chamber furnace - elf model 14 litres with controller
Hide thumbs
1
Table Of Contents
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
page
of
52
Go
/
52
Contents
Table of Contents
Bookmarks
Table of Contents
Table of Contents
1 Symbols and Warnings
Switches and Lights
General Warnings
2 Installation
Unpacking and Handling
Siting and Setting up
Chimney
Hearth
Door Vents
Electrical Connections
301 Controller
PID Control
Basic Operation of the 301 Controller
Menu System
Navigation Diagram
Basic Function Guide
Home Display
Hold Mode
Checking the Temperature Setpoint from the Home Display
Changing the Temperature Setpoint
Changing the Temperature Setpoint Ramp Rate
Changing the Timer Time
Advanced Operation
Entering the Setup Menu
Changing the Timer Type
Changing the Timer Band
Changing the Maximum Output Power
Changing the Customer Calibration Type
Calibration Password
Temperature Setpoint Ramp Rate
Setpoint Ramp Rate
Limitations of Setpoint Ramp Rate
The Timer
Starting the Timer
Checking the Time Remaining
Pausing the Timer
Resetting the Timer
Timer Function Description
The Timer Temperature Band
Timer Function Table
Ramp Dwell Programming
Setting up a Ramp Dwell Program
Maximum Output Setting
Customer Calibration
Factory Calibration - Fact
Single Point Calibration - C.CL1
Changing the Single Point Calibration Offset - Ofst
Dual Point Calibration - C.CL2
Changing the Calibration, Low Temperature - CAL.L
Changing the Calibration, Low Temperature Offset - OFS.L
Changing the Calibration, High Temperature - CAL.H
Changing the Calibration, High Temperature Offset - OFS.H
Over-Temperature Protection
Over-Temperature (O/T) Home Display
Changing the Over-Temperature Limit
Checking the Over-Temperature Sensor Temperature
Over-Temperature Protection Calibration
Over-Temperature Activation
Resetting Over-Temperature Activation
RS232 Communication Option
Temperature Controller Replacement
Glossary of Terms
Controller Fault
4 Operation
Operating Cycle
General Operating Notes
Use of Probes
Atmospheres
Operator Safety
Power Adjustment
5 Maintenance
General Maintenance
Cleaning
Safety Switch
Calibration
After-Sales Service
Recommended Spare Parts and Spare Parts Kit
6 Repairs and Replacements
Safety Warning - Disconnection from Power Supply
Safety Warning - Refractory Fibre Insulation
Temperature Controller Replacement
Solid-State Relay Replacement
Thermocouple Replacement
Element Replacement
Fuse Replacement
Door Plug Replacement
Air Inlet Adjustment
7 Fault Analysis
Furnace Does Not Heat up
Product Overheats
8 Wiring Diagrams
Wa-11-31
9 Fuses and Power Settings
Fuses
Power Limit
10 Specifications
Environment
Service Record
Advertisement
Quick Links
1
301 Controller
2
Basic Operation of the 301 Controller
Download this manual
Installation, Operation and Maintenance Instructions
1100 °C Chamber Furnace - ELF Model: 14 Litres
301 Controller
ELF 11/14B + 301 Controller
MEN-ELF1114B-01_301
28-11-2017
(
)
Table of
Contents
Previous
Page
Next
Page
1
2
3
4
5
Advertisement
Table of Contents
Need help?
Do you have a question about the ELF 11/14B and is the answer not in the manual?
Ask a question
Questions and answers
Related Manuals for Carbolite Gero ELF 11/14B
Furnace Carbolite Gero EVZ 12/600B Installation, Operation And Maintenance Instructions
1200 c tube furnace (3-zone) (58 pages)
Furnace Carbolite Gero EVZ 12/450B Installation, Operation And Maintenance Instructions
1200 c tube furnace (3-zone) - evz model: 450mm no controller (40 pages)
Furnace Carbolite Gero EVT 12/150B Installation, Operation And Maintenance Instructions
(34 pages)
Furnace Carbolite Gero AAF 11/18 Installation, Operation And Maintenance Instructions
1100 'c ashing furnace aaf model 18 litres (52 pages)
Furnace Carbolite Gero 3508 Installation, Operation And Maintenance Instructions
1100 'c ashing furnace aaf model 18 litres (52 pages)
Furnace Carbolite Gero HTF 17/10 Installation, Operation And Maintenance Instructions
1700c, chamber furnace, htf 10 litres with controller (50 pages)
Furnace Carbolite Gero MTT 12/38/850 Installation, Operation And Maintenance Instructions
1200 c carbon 14 tritium analysis furnace 850mm controller (56 pages)
Furnace Carbolite Gero GPCMA 174 Installation And Operation Instructions Manual
1000-1150 c retort chamber furnace (50 pages)
Furnace Carbolite Gero HTRH Operating Instructions Manual
Standard furnace (23 pages)
This manual is also suitable for:
301
Table of Contents
Print
Rename the bookmark
Delete bookmark?
Delete from my manuals?
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL
Need help?
Do you have a question about the ELF 11/14B and is the answer not in the manual?
Questions and answers