POP OUT TRASH RACCOON
WARNING: DO NOT TURN ON THE PROP UNTIL FULLY ASSEMBLED. STAY CLEAR OF THE PROP WHILE OPERATING.
1. METAL BASE AND
CONTROL BOX
2. FABRIC TRASH CAN
3. RACCOON
4. SAND BAG
5. 6V 2A ADAPTER
6. METAL STAKES
1. Roll back the fur fabric on the
RACCOON and push the spring
lock to secure the RACCOON to
the METAL BASE AND CONTROL
BOX. Release spring lock
to secure.
MATCH A TO A
5. Connect the wire bundle from
the CONTROL BOX to the wire
bundle running from the
motion sensor.
MATCH C TO C
INSTALLATION AND OPERATING INSTRUCTIONS
KEEP ALL PLASTIC AND WIRE PARTS AWAY FROM CHILDREN.
ESTIMATED ASSEMBLY TIME SEVEN MINUTES.
1.
2. Connect the wire bundle from
the MODULE to the wire bundle
from the RACCOON.
MATCH B TO B
6. Locate the front foot of the
METAL BASE.
Slide the SANDBAG over the front
foot of the METAL BASE and slide
it towards the RACCOON BODY.
PARTS
2.
3.
ASSEMBLY
3. Unfasten the two ties at the
base of the FABRIC TRASH
CAN and unfold from
collapsed position.
7. Wrap and secure the rst hook
and loop fastener in the front of
the FABRIC TRASH CAN over the
front foot of the METAL BASE.
™
4.
5.
4. Insert the assembled
RACCOON and METAL BASE into
the FABRIC TRASH CAN.
Position the METAL BASE over
the three sets of hook and loop
fasteners.
8. Wrap and secure the second
set of two hook and loop
fasteners in the middle of the
FABRIC TRASH CAN over the
middle arms of the METAL BASE.
6.
Need help?
Do you have a question about the POP OUT TRASH RACCOON and is the answer not in the manual?
Questions and answers