Pelsue TFAT-14C Product Manual page 15

Telescopic fall arrest tower
Table of Contents

Advertisement

5.2 - Product Installation & Set-up (continued)
2. Setup of the #TFAT-14C Telescopic Fall Arrest
Tower:
Choose a location where installation will provide suitable
proximity to the work area yet minimize obstructions during
use and in the event a rescue is necessary. Once a location
is chosen;
a. Align the holes in the tower base with the holes of the base
plate "ears" and insert the base's pin in order to secure
the tower to the base plate (Refer to Fig. #5.2b).
b. Plumb the #TFAT-14C using the levelling pegs (Refer to
Fig. #5.2c) so that the structure is vertical and perpen-
dicular to the intended working surface.
Leveling
Pegs
! WARNING ! - The Model #TFAT-14C must be
plumbed vertically prior to the attachment of any
lifeline. The #TFAT-14C is only approved for life-
line attachment when mounted vertically
#501003-001 - Product Manual: Model #TFAT-14C TELESCOPING FALL ARREST TOWER - Revision 00 - Date: 06-16-2008
Figure #5.2c: #TFAT-14C
Tower Vertical and Secured to Structure
Figure #5.2b: #TFAT-14C
Base Pin
! WARNING ! - Ensure that the
mounting structure will withstand
all loads imparted to it by the proof-
loaded #TFAT-14C tower system
! WARNING ! The Model #TFAT-14C must
be positioned so that the lifeline angle will
not exceed 20 degrees off of the vertical in
the event that a fall occurs.
Page 15

Advertisement

Table of Contents
loading

Related Products for Pelsue TFAT-14C

Table of Contents