Maintenance; Maintenance Instructions - BeaconMedaes 4107 9027 47.00 Installation, Operation And Maintenance Instructions

Table of Contents

Advertisement

Wall Mount Gas Control Panel
5.

Maintenance

CAUTION:
If leaks are heard inside panel, locate zone
valve for room and turn it off. Release
pressure from system before removing
mounting screws.
5.1

Maintenance Instructions

Leak testing internal parts of panel shall be
made without disconnecting panel from piping
system.
1. Remove front panel from wall mounting box
by removing four mounting screws located
on front panel.
2. Carefully pull front panel, with control
assembly, out of mounting box.
control assembly in position which allows full
view of all connections.
3. Adjust control pressure to 160 psig. Leak
test all connection using oxygen compatible
leak detection solution. Look for bubbles
indicating leaks.
detection solution from all connections after
testing.
4. Place control panel in mounting box and
secure in place with four mounting screws.
5. Perform test according to section 4.1.
NOTE:
Correct leaks using appropriate procedures.
4107 9027 47.00
Support
Wipe remaining leak
4

Advertisement

Table of Contents
loading

Table of Contents