14.0 WARRANTY The warranty set forth herein is given expressly and is the only warranty given by the Galvin Engineering Pty Ltd. With respect to the product, Galvin Engineering Pty Ltd makes no other warranties, express or implied. Galvin Engineering Pty. Ltd. hereby specifically disclaims all other warranties, express or implied, including but not limited to the implied warranties of merchantability and fitness for a particular purpose.
Page 22
Galvin Engineering Thermostatic Mixing Valve or Tempering Valve Commissioning Report and/or Maintenance Report Note: Please use a separate form for each valve. The original copy of the report is to be given to the owner/occupier and retained on site for a minimum of 7 years.
Page 23
Galvin Engineering Thermostatic Mixing Valve or Tempering Valve Commissioning Report and/or Maintenance Report Test Results Valve considered satisfactory for use: Yes □ No □ If No, state the reason and action taken: ____________________________________________________________________________________________ ____________________________________________________________________________________________ ____________________________________________________________________________________________ Commissioning Work It is hereby certified that all the commissioning work has been carried out by the undersigned in accordance with the requirements of the Codes of Practice indicated prior.
Page 24
Galvin Engineering Thermostatic Mixing Valve or Tempering Valve Commissioning Report Valve Location/Building : ____________________________________________________ Room or Area: ____________________________________________________________ Work Order No.:___________________________________________________________ Flow rate of Design Water (LPS) Temp of Warm Water (C) Warm Water *Name/Type/Size and location of Outlet Outlet Fixture (Bath, Shower, Basin, Fixture No.
Page 25
Galvin Engineering Thermostatic Mixing Valve or Tempering Valve Commissioning/Maintenance Report The following information is to be provided by the site manager/owner/occupier. Valve size and installation recommended by : ___________________________________________________ Valves supplied by: ________________________________________________________________________ Date of Installation: _________________________ Drawing No. ____________________________________ Service Manual on Site: Yes □...