Empire DV-210-10SG Installation Instructions And Owner's Manual page 17

Direct vent wall furnace
Table of Contents

Advertisement

Available languages

Available languages

OPTIONAL BLOWER INSTALLATION INSTRUCTIONS
DVB-1 For Direct Vent Wall Furnaces DV-210-(7, 9)SG and DV-215-(7, 9)SG
Oiling the Motor
Oiling holes are provided on each end of the motor for oiling. The
blower should have five drops of #20 motor oil every 6 months.
Do not use machine oil.
Cleaning the Blower Wheel
In some areas, such as near bedrooms and on floors with a hard
surface, the blower wheel will be filled with lint very quickly. A visual
check of the blower wheel should be made after 30 days use. The
blower will run faster with a dirty wheel, but move less air. Remove
the entire blower and clean each blade of the wheel with a tooth
brush as often as necessary.
32193-3-0514
Index No.
Part No.
Description
1
R-1268
Wire Assembly
2
R-896
Bushing (Three Required)
3
R-1156
Fan Control
4
DV-806
Switch Box
5
DV-807
Switch Box Cover
6
TH-111
Junction Box
7
R-1410
Bushing (Strain Relief)
8
R-285
Motor
9
R-587
Motor Cushion
10
TH-341
Blower Cushion
11
TH-356
Motor Support Assembly
12
R-319
Blower Wheel
13
TH-135
Blower Housing Assembly
14
R-315
Cord Set
Page 17

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dv-215-10sg

Table of Contents