REID LIFTING PORTABASE Assembly & Operation Manual

REID LIFTING PORTABASE Assembly & Operation Manual

Hide thumbs Also See for PORTABASE:

Advertisement

Quick Links

PORTABASE
Assembly & Operation Guide
US.REIDLIFTING.COM

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PORTABASE and is the answer not in the manual?

Questions and answers

Summary of Contents for REID LIFTING PORTABASE

  • Page 1 PORTABASE Assembly & Operation Guide US.REIDLIFTING.COM...
  • Page 2 Contents PORTABASE Correct Operation ATEX Intended Use ATEX Inspection Prior to Initial Operation Classification [Zone 2] Inspection Before Starting Work Spark Formation Lightweight. Maximum Capacity Static Electricity Temperature Range Inspection, Maintenance & Repair Notes for Correct Operation Assembly Instructions Warning Portable.
  • Page 3: Correct Operation

    Lifting of Personnel: For the lifting of personnel information on page 23 or consult your supplier. forces will be limited by the use of personal fall REID Lifting will reduce the capacity by half, protection equipment, including load limiting thereby increasing the safety factor of the product.
  • Page 4: Notes For Correct Operation

    Ensure the hub is leveled before inserting use of your chosen REID Lifting Davit system or tie it to a rigid structure to ensure it Always wear appropriate PPE when installing, the Davit can’t overturn...
  • Page 5 Fall Protection Applications PORTABASE Use as a Fall Protection Anchor Additional Notes for Correct Operation Warning The substrate of the structure on which the It is essential for safety that the product is This product has different ratings depending upon &...
  • Page 6 F = Maximum Rated Force F = Maximum Rated Force **Only Davits up to 31½ radius can be used with the PORTABASE H Base System **Only Davits up to 31½ radius can be used with the PORTABASE H Base System...
  • Page 7 ANSI Z359.18 F = Maximum Rated Force F = Maximum Rated Force **Only Davits up to 31½ radius can be used with the PORTABASE H Base System * Set up is indicative * Set up is indicative...
  • Page 8 ANSI Z359.18 and meets the requirements of ANSI Z359.18 **Only Davits up to 31½ radius can be used with the PORTABASE H Base System **Only Davits up to 31½ radius can be used with the PORTABASE H Base System...
  • Page 9: Inspection And Maintenance

    Ensure levelling feet are not showing any signs system is being used. items on top of it. criteria, please contact your supplier or REID Lifting. and every 12 months for goods only, unless of deformation, corrosion or damage. No alterations or additions to the equipment...
  • Page 10: Static Electricity

    To mitigate the risk powder coated sections profiles come into contact, and should be wiped incorrect and REID Lifting will not accept any Inspections must be instigated by the user prior of protection where mixtures of air and gases, aluminum, magnesium or pertinent alloys.
  • Page 11 Assembly Instructions PORTABASE The PORTA BASE [H Base] and its constituent components are described in the image below. The H Base system will be delivered in three components which are the Left Leg Assembly, Right Leg Assembly and Central Hub.
  • Page 12: Basket Assembly

    Assembly Instructions PORTABASE The PORTA BASE [Counterbalance] and its constituent components are described in the image below. The Counterbalance system will be delivered in five components which are the Left Leg Assembly, Right Leg Assembly, Central Hub, Tail and Basket.
  • Page 13 Assembly Instructions PORTABASE Castors are for positioning purposes only and not suitable Ensure all Leveling Feet are in contact with the surface so that for loading. the load is evenly distributed. Remove the first side plate from the storage Insert the first side plate between the end plate Ensure the side plate sits correctly over the pin.
  • Page 14: Variants & Options

    2. Height adjustable feet can be fitted to the Position the system in place for the lift before PORTABASE Counterbalance weight basket. This setting the height provides additional fine height adjustment [up Manually raise each leg in turn and set the to 9”].
  • Page 15 Dimensions PORTABASE PORTABASE [H Base] PORTABASE [Counterbalance] 37¾” 23½” 17¾” 45¼” 25” 13” 9½” 76¾” 5½” 12¾” 63” 95” 72” Max - 56¼” Min 107” Max - 91¼” Min...
  • Page 16: Quality & Safety

    Accreditations Conformité Européenne [CE] Testing Product IPR LEEA Membership - REID Lifting is a full member of the Lifting Equipment Engineers Association This product complies with the following: REID Lifting’s products have been designed, Quality and Safety are at the heart of the REID...
  • Page 17: Product Labeling

    PORTADAVIT QUANTUM Product labelling Safety Labels Serial Labels PORTABASE [H Base] The following labels must be present on your system and must be legible. Insert and secure the bolt before The system is not suitable for fall arrest applications. loading the system.
  • Page 18 Marking Product labelling into table here: The following labels must be present on your system and must be legible. PORTABASE [Counterbalance] The serial labels indicate: The product identification number The product’s unique serial number The goods’ capacity (WLL) of the device...
  • Page 19 Notes Notes PORTADAVIT QUANTUM Periodic Examination & Repair History Date Inspected by Pass/Fail Corrective Action Comments...
  • Page 20 Notes Notes...
  • Page 21: United States Of America

    All information herein is copyright protected by REID Lifting Ltd. All company and product names are Trade Mark and Trade Name protected and all REID Lifting Ltd. Product IPR is protected under Patents, Patents Pending and/or Design Rights.

Table of Contents