Download Print this page

Yamaha SILENT Piano SD Series Service Manual page 7

Hide thumbs Also See for SILENT Piano SD Series:

Advertisement

2.
Disassembling the Switch Box Unit
2-1
Switch Box Front Panel
(Time required: About 1 minute)
2-1-1 Pull out the two (2) knobs for [VOLUME] and
[REVERB], and remove the four (4) screws marked
[71G]. The switch box front panel can then be
removed. (Fig. A-3)
2-2
Switch Box Upper Case
(Time required: About 2 minutes)
2-2-1 Remove the switch box front panel. (See procedure A-2-1)
2-2-2 Remove the three (3) screws marked [61G]. The
switch box upper case can then be removed.
(Fig. A-3)
Switch box front panel
(SB前パネル)
[61G]: Bind Head Tapping Screw-S (Sタイト+BIND) 3.0X6 MFZN2B3 (WE877800)
[71G]: Flat Head Tapping Screw (Sタイト+FLAT) 3.0X6 MFZN2B3 (WE986900)
2-3
DM Circuit Board (Time required: About 4 minutes)
2-3-1 Remove the switch box front panel. (See procedure A-2-1)
2-3-2 Remove the switch box upper case. (See procedure A-2-2)
2-3-3 Remove the two (2) screws marked [121G] and two
(2) screws marked [122G]. The DM circuit board
can then be removed. (Fig. A-4)
2-4
DC-IN Circuit Board
(Time required: About 3 minutes)
2-4-1 Remove the switch box front panel. (See procedure A-2-1)
2-4-2 Remove the switch box upper case. (See procedure A-2-2)
2-4-3 Remove the two (2) screws marked [131G]. The DC-
IN circuit board can then be removed. (Fig. A-4)
2-5
Connector assembly-SW
(Time required: About 4 minutes)
2-5-1 Remove the switch box front panel. (See procedure A-2-1)
2-5-2 Remove the switch box upper case. (See procedure A-2-2)
2-5-3 Remove the DC-IN circuit board. (See procedure A-2-4)
2-5-4 Disconnect the connector of the connector
assembly-SW from the AM circuit board. While
holding down the hooks on the both sides of the
seesaw switch, pull out the seesaw switch and
remove the connector assembly-SW. (Fig. A-4)
[61G]
[71G]
[71G]
Knob
(ツマミ)
[71G]
Fig. A-3(図A-3)
2.
SW BOX ユニットの分解
SB 前パネル(所要時間: 約 1 分)
2-1
2-1-1
[VOLUME] ・ [REVERB]コントロール用のツマミ 2
個を引き抜き、 [71G]のネジ 4 本を外して、SB 前パ
ネルを外します。 (図 A-3)
2-2
SB 上ケース(所要時間: 約 2 分)
2-2-1
SB 前パネルを外します。 (A-2-1 項参照)
2-2-2
[61G]のネジ 3 本を外して、SB 上ケースを外しま
す。 (図 A-3)
Switch box upper case
(SB上ケース)
[61G]
[71G]
2-3
DM シート(所要時間: 約 4 分)
2-3-1
SB 前パネルを外します。 (A-2-1 項参照)
2-3-2
SB 上ケースを外します。 (A-2-2 項参照)
2-3-3
[121G]のネジ 2 本と[122G]のネジ 2 本を外して、
DM シートを外します。 (図 A-4)
DC-IN シート(所要時間: 約 3 分)
2-4
2-4-1
SB 前パネルを外します。 (A-2-1 項参照)
2-4-2
SB 上ケースを外します。 (A-2-2 項参照)
2-4-3
[131G]のネジ2本を外して、 DC-INシートを外しま
す。 (図 A-4)
2-5
SW 束線(所要時間: 約 4 分)
2-5-1
SB 前パネルを外します。 (A-2-1 項参照)
2-5-2
SB 上ケースを外します。 (A-2-2 項参照)
2-5-3
DC-IN シートを外します。 (A-2-4 項参照)
2-5-4
AM シートから SW 束線のコネクタを抜きます。 照
光シーソー SW の両横にあるツメを押さえながら
パネルの手前に押し出して、SW 束線を外します。
(図 A-4)
SILENT SD SERIES
7

Advertisement

loading