NHP TERASAKI TEMBREAK PRO P250 3P Installation Instructions

Moulded case circuit breakers

Advertisement

Quick Links

INSTALLATION INSTRUCTIONS
MOULDED CASE CIRCUIT
BREAKERS
TEMBREAK PRO
P250 3P SMART ELECTRONIC
N H P El e c t r i c a l En g i n e e r i n g Pr o d u c t s Pt y L t d
A.B.N. 84 004 304 812
A U S 1 3 0 0 N H P N H P
n h p .c o m .a u
N Z
0 8 0 0 N H P N H P
n h p -n z.c o m
P250_3_SE-IN-001-EN V1.0.0

OPERATING INSTRUCTIONS

I (ON)
TRIP
I (ON)
O (OFF)
O (OFF)
TRIPPED
Operation
OFF → ON
Trip
ON → OFF
Button
TRIP → OFF
DIRECTION OF POWER SUPPLY
3
OR
3

TOOLS REQUIRED (NOT included)

T3
T1
T2
17mm
Screwdriver
Screwdriver
Socket
Flathead
Phillips (#2)
wrench
(5mm)

HARDWARE (included)

A
B
C
D
M8x20
M8 flat
M8 spring
M4x55
Socket screw
washer
washer
mounting
(6 qty)
(6 qty)
(6 qty)
screws
(2 qty)

HARDWARE (NOT included)

or
F
G
H
Lugs or
*M10x25 hex
*M10 flat
Copper Bars
bolt
washer
(6 qty)
(6 qty)
*For extension bar connection only
OPTIONAL (NOT included)
K
L
M
Extension Bars
Terminal
Covers
Lock

INTERNAL ACCESSORIES ASSEMBLY PROCEDURE*

STEP 2
STEP 1
TRIP MCCB
1
TRIP
Push Trip
1
Button
STEP

UVT/SHUNT INSTALLATION

Force (Nm)
1
4.1
4.1
55
40
65
SHUNT
ALARM
1
4.2
STEP

ALARM INSTALLATION

4.2
*For additional internal acccessory installations, scan QR code and refer to user manual for more details
MOUNTING ANGLES
T5
T4
ON
17mm Ring
6mm Allen
Spanner
key Socket
wrench
ON
ON
ON
E
Instruction
Interpole
Manual
Barriers
(This Document)

DIMENSIONS

(2 qty)
(1 qty)
98
L C
J
I
*M10 Belleville
*M10 nut
(6 qty)
washer
(6 qty)

CLEARANCE

BR
BR
1
2
N
Internal
Handle
Accessories
Lock
Y
STEP 3
OPEN COVER
1
2
3
2
3
2
3
MOUNTING
35
D
T2
126
D
TORQUE
1.3 - 1.7 Nm
24
H L
M8 screw
L C
46
7
22
60
70
68 : Panel cutout
105
75: Height of OCR
1.5
77: Height for label
95.5
Y min
Z min
MCCB Cat No.
SIDE PLATE
(mm)
(mm)
(EARTHED METAL)
25
P250F
0
P250N
0
25
0
25
P250H
Z
BR
,BR
= Adjacent Isolators / MCCBs
1
2
IDENTIFY TRIP BAR
ALARM TRIP BAR
&
MECHANISM
ALARM LOCATION
4
5
4
5
CLEARANCE
TOP PLATE
INSULATION
(EARTHED METAL)
PLATE
X
X
1
1
X
X
2
2
BR
BR
1
1
BR
,BR
= Adjacent MCCBs
1
2
W*
W*
INSULATION
BR
BR
2
2
*distance from conductor insulation to downstream MCCB
W* min
X
min
X
min
MCCB Cat No.
1
2
(mm)
(mm)
(mm)
P250F
50
40
30
P250N
80
80
30
P250H
80
80
30
SHUNT/UVT TRIP BAR
SHUNT LOCATION
STEP 5
CLOSE MCCB COVER
2
1
1
3
4
OFF

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TERASAKI TEMBREAK PRO P250 3P and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for NHP TERASAKI TEMBREAK PRO P250 3P

  • Page 1 MOUNTING ANGLES MOUNTING CLEARANCE TOOLS REQUIRED (NOT included) TOP PLATE INSULATION (EARTHED METAL) PLATE 17mm 17mm Ring Screwdriver Screwdriver 6mm Allen Socket Spanner key Socket Flathead Phillips (#2) wrench (5mm) wrench INSTALLATION INSTRUCTIONS HARDWARE (included) MOULDED CASE CIRCUIT BREAKERS TORQUE 1.3 - 1.7 Nm TEMBREAK PRO Instruction...
  • Page 2 SMART AX/AL INSTALLATION PROCEDURE FRONT TRIP UNIT ADJUSTMENT PROCEDURE -- EXTENSION BAR CONNECTION PROCEDURE CONDUCTOR CONNECTION PROCEDURE -- CONNECTION M8x20 Socket screw Lug or copper bar I M10 Belleville washer M8 Spring washer M10x25 hex bolt M10 Nut M8 Flat washer M10 Flat washer Extension Bar STEP 1...

Table of Contents