Connecting Refrigerant Pipe - Midea MAD020T1N1S1 Technical Manual

Hide thumbs Also See for MAD020T1N1S1:
Table of Contents

Advertisement

Midea Precisi
on AC Technic
cal Manual
Mode
el
MA033
31
MA043
31
MA054
41
MA060
01
MA075
52
MA098
82
It i
s suggested
d that use M
For ver
rtical instal
llation
It is
s suggested
d that use M
3.4 Conne
ecting refr
rigerant pi
Fo
or ensure sa
fety, before
the
e nitrogen in
n the air con
Do
o the heat in
sulation for
ob
bstacles, vibr
ration isolati
co
pper pipes d
direct contac
pa
articles and s
so on away f
It n
needs to app
ply high qua
46
All manuals and user guides at all-guides.com
L1
H1
1112
1
764
1310
1
1066
1604
1
2105
2
M6×20 expan
nsion bolt fo
6×20 expan
nsion bolt fo
ipe
welding the
pipelines a
ditioner syst
tem, which c
the copper p
pipes. When
ing measure
ements as s
ct with the w
wall, meanw
from the cop
pper pipes.
ality silver fib
ber for weldi
M
MCAC-PDSM
(Un
nit: mm)
D1
D2
49
63
r fixing the m
mounting ba
ase.
r fixing the m
mounting ba
ase.
nd welding s
spots, must
completely
can release
the system
pressure.
n the copper
r pipes go th
hrough the w
hock pad sh
hould be don
ne for avoidi
hile pay atte
ention to kee
ep dust, aqu
ng the pipel
ine connect
tors. During
M-2013-01
discharge
walls or othe
er
ing the
ueous vapor,
,
the welding

Advertisement

Table of Contents
loading

Table of Contents