1. Introduction User manual Thank you for purchasing the semi-knocked down [SKD) server rack from Nexxt Solutions. Each floor unit is housed in lockable heavy-gauge metal enclosure designed to IMPORTANT SAFETY INFORMATION house any rack-mounted components, such as server and storage units, modular network or voice switches, routers, telecommunication systems and IT equipment.
Page 3
2.Preliminary steps • Prior to installing this product, you must read all instructions thoroughly. Split mesh rear door with lock • Keep these instructions handy in an easily accessible location for future reference. • A clean, flat, level, and protected floor area should be provided for cabinet assembly to prevent damage to parts.
Page 4
M4x8mm self-tapping screw M12xL90 leveling foot Door hinge bushing L-shaped allen wrench 2 with brakes Caster wheel 2 without brakes M6 flange nut Cable entry plate (1 for top and 2 for bottom panel) Extender block Equipment mounting hardware Grounding cable with terminal rings 3 sets M6 cage nut Bottom ventilation plate...
Page 5
Phase Required parts Steps Frame installation to bottom tray Installation of casters and feet 1. Align the frame (left side first) with the mounting holes on the 1. Identify the 2 caster wheels with brake mechanism and the 2 bottom tray. Using the M8 screws and M8 flange nuts, secure both regular caster wheels which will be used in the back of the cabinet.
Page 6
Top cover assembly 5. The top and bottom frame subassembly is now complete. 1. Align the frame (left side first) with the mounting holes on the top tray. Using the M8 screws and M8 flange nuts, secure both parts together. Note: position the top tray with the cable entry plate, that you already installed, pointing towards the rear section of cabinet.
Page 7
800mm 800mm enclosure 3. Secure the assembly by inserting the M6 phillips-head screws and washers from the inside through the horizontal beam holes and into Mounting the extender blocks the cage nuts installed in the frames. Use the extender blocks to mount 19in wide devices and managers in a 30in wide enclosure, if needed.
Page 8
Installation of vertical rails Attaching the cable management system 1. Identify the 4 vertical perforated mounting rails. 1. Position the cable manager towards the rear section, making sure to align the mounting holes at the top, middle and bottom of 2.
Page 9
Rear door assembly Installation of side panels 1. Identify the split rear door, bushings and pivot pins. 1. Next, identify the 2 lateral panels. Both are identical for this model. 2. Insert the first bushing into the pivot pin at the bottom of the door and hold it in place.
Page 10
Front door assembly Grounding connection 1. Identify the front door, bushing and pivot pins. 1. Connect the first grounding cable to the door using the provided hardware. 2. Insert the bushing into the pivot pin at the bottom of the door and hold it in place.
Page 11
Equipment installation The enclosure is now assembled and ready for equipment Notes installation. 1. Do not install any equipment until you have stabilized the M6 cage nuts (40) structure. 2. Always load the heavier items at the bottom first, followed by the lighter equipment at the top of the enclosure, for safety reasons.