Download Print this page
Nexxt Solutions Professional Series Quick Start Manual

Nexxt Solutions Professional Series Quick Start Manual

2-post, 19-inch open rack steel frame with square holes
Hide thumbs Also See for Professional Series:

Advertisement

Quick Links

25/45
RACK UNITS
2-post, 19-inch open rack
Steel frame with square holes
NPO-2P25UB
NPO-2P45UB
ProfessionalSeries

Advertisement

loading
Need help?

Need help?

Do you have a question about the Professional Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Nexxt Solutions Professional Series

  • Page 1 25/45 RACK UNITS 2-post, 19-inch open rack Steel frame with square holes NPO-2P25UB NPO-2P45UB ProfessionalSeries...
  • Page 2: Main Features

    SHOCK HAZARD. [CBN) of your facility. Nexxt solutions does not warrant against damage caused by the use of any Nexxt Solutions structures for any purposes other than those for which it was designed or 1. Phillips screwdriver damage caused by unauthorized attachments or modifications, and is not responsible for any damages, claims, demands, suits, actions, or causes of action of whatever kind 2.
  • Page 3 3. Product overview and components Quantity Rack assembly hardware (continued) Upon opening the box, make sure to inspect and account that all the items listed below are included. M8 flat metal washer Part ID Item Quantity Image Combination wrench M8 (13mm) Rack assembly components M10x80mm anchoring bolt Vertical rail...
  • Page 4 4. Assembly procedure (recommended) Phase Required parts Step Upon opening the box, inspect the contents to ensure that all the items listed above Top frame subassembly are included: 1. Align the top bracket with the holes on the left vertical rail and secure it using the M8 bolts and washers.
  • Page 5 Bottom frame assembly Rack frame assembly Top bracket subassembly Installation of the cable management hooks 1. Using the top bracket subassembly, align the vertical rail with the bottom bracket, base extension plate and base stand. 1. At this point, place the rack in the upright position. 2.
  • Page 6 Equipment installation The rack is now assembled and ready for equipment installation. 1. Do not install any equipment until you have stabilized the M8 cage nuts (20 or 40) structure. 2. Always load the heavier items at the bottom first, followed by the lighter equipment at the top of the rack, for safety reasons.
  • Page 7 Notes Notes...

This manual is also suitable for:

Npo-2p25ubNpo-2p45ub