Installing The Water Line - Smeg FQ55UFX Manual

Table of Contents

Advertisement

4.5 Installing the Water Line

Installing the water line
Water line installation kits are available as an additional accessory
from your dealer or at a local hardware store.
Connection to the water supply line
1. First, shut off the main water supply line and turn the icemaker
off.
2. Located the nearest cold water supply valve.
3. After connecting the water supply to the water valve, turn your
main water supply back on and flush several gallons of water to
clear the water supply line.
The minimum inlet water pressure:147kPa
The maximum inlet water pressure:834kPa;
Connecting the water line to the refrigerator
There are several items
connection.
You will find these items sold as a kit at your local hardware store.
1.
First water tubes (supplied) insert into corresponding hole of
water connector (supplied).
2.
Next, water line installation kit (not included) inserts into
another hole of water connector (supplied).
3.
Turn water valve on and check for any leakage.
Connecting the water line to a drinkable water source
If your water line is NOT drinkable please add an external water
filter.
If you must repair or disassemble the water line, cut off the plastic
tubing to make sure you get a snug, leak-free connection.
that you need to purchase to complete this
Shut-off valve
Water line installation kit
Water connector
Water tube
15
Cold water line
Tube clamp

Advertisement

Table of Contents
loading

Table of Contents