Installation Guide
Roof Curb
For Medium Foundation Packaged Rooftops
7.5 – 12.5 Tons
M M o o d d e e l l N N u u m m b b e e r r : : BAYCURB310*
U U s s e e d d w w i i t t h h : : EBC090-150, GBC090-150
Only qualified personnel should install and service the equipment. The installation, starting up, and servicing of heating, ventilating, and air-conditioning
equipment can be hazardous and requires specific knowledge and training. Improperly installed, adjusted or altered equipment by an unqualified person
could result in death or serious injury. When working on the equipment, observe all precautions in the literature and on the tags, stickers, and labels that
are attached to the equipment.
May 2021
S S A A F F E E T T Y Y W W A A R R N N I I N N G G
R R T T - - S S V V N N 0 0 3 3 7 7 A A - - E E N N

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the BAYCURB310 Series and is the answer not in the manual?

Questions and answers

Summary of Contents for Trane BAYCURB310 Series

  • Page 1 Installation Guide Roof Curb For Medium Foundation Packaged Rooftops 7.5 – 12.5 Tons M M o o d d e e l l N N u u m m b b e e r r : : BAYCURB310* U U s s e e d d w w i i t t h h : : EBC090-150, GBC090-150 S S A A F F E E T T Y Y W W A A R R N N I I N N G G Only qualified personnel should install and service the equipment.
  • Page 2 ( ( E E x x a a m m p p l l e e s s ; ; c c u u t t impact to the environment. Trane advocates the...
  • Page 3 Notify the carrier’s terminal of the damage This document and the information in it are the immediately by phone and by mail. property of Trane, and may not be used or reproduced • Concealed damage must be reported within 15 in whole or in part without written permission.
  • Page 4 General Information This manual describes the layout and installation does not interfere with the clearance required for the procedures required to properly assemble and install supply/return ductwork. the roof curb. Illustrations are provided for dimensional data regarding roof opening construction. Each curb Clearances package ships un-assembled, along with the required hardware and gasketing material.
  • Page 5 G G e e n n e e r r a a l l I I n n f f o o r r m m a a t t i i o o n n Figure 2. Center of gravity/corner weights Table 2.
  • Page 6 Installation Read the entire manual carefully to become familiar Figure 3. Curb rail assembly with the roof curb installation procedures. If the roof End Rail curb will be mounted on a new building, it can be assembled at any convenient location and installed as Side Rail soon as the roof support members are in place.
  • Page 7 I I n n s s t t a a l l l l a a t t i i o o n n Figure 6. Typical installation on existing construction local building codes. • The duct must be hung from the curb flanges inside the curb walls.
  • Page 8 For more information, please visit trane. com or americanstandardair.com. Trane and American Standard have a policy of continuous product and product data improvement and reserve the right to change design and specifications without notice. We are committed to using environmentally conscious print practices.

Table of Contents