DaimlerChrysler Dodge Sprinter 2007 Manual page 52

Maintenance service schedule
Table of Contents

Advertisement

Confi rmations
Body builder
2nd body builder
The following work/modifi cations
have been carried out, e.g. on the
chassis, cab, body (panel van) or
3
mounting of additional assemblies
or superstructures:
The vehicle has been subjected to
quality control/fi nal inspection with
regard to any work/modifi cations
carried out. No faults/defects were
found.
22
Please tick as appropriate:
Work carried out and equipment
installed in accordance with
DaimlerChrysler Body/Equipment
Mounting Directives
Special authorization obtained
from DaimlerChrysler AG, body
approvals department (see Body/
Equipment Mounting Directives)
Operating and maintenance
instructions for the work/
modifi cations carried out or
for assemblies installed have
been added to the vehicle's
documentation
Place
Date
Odometer reading
Signature
Stamp of body manufacturer
2007 Dodge Sprinter

Advertisement

Table of Contents
loading

Table of Contents