Installation; Unpacking; Preparation Of The Coffee Grinder; Positioning The Machine - CMA Dishmachines AK Use And Maintenance Manual For The Technician

Fully-automatic espresso coffee machine
Hide thumbs Also See for AK:
Table of Contents

Advertisement

Technical manual
4.

INSTALLATION

4.1

Unpacking

For correct unpacking proceed as follows to unpack the machine
correctly:
1)
Cut the straps around the packaging.
2)
Pull the box off upwards.
3)
Position the machine on the worktop.
We recommend you keep the packaging until the
guarantee period has expired.
4.2
Preparation of the coffee-grinder
Fit the coffee hoppers in place on the two grinders.
4.3

Positioning the machine

There has to be plenty of room for the appliance and for
using it correctly.
Prepare the counter where the machine will be placed
and make sure it can bear its weight.
It is important that all the terminals of the connections
to the electricity and to the water mains are easy to reach
and in the immediate vicinity of the machine.
To work properly the machine has to stand
on a perfectly level surface.
Any corrections needed to level the machine
can be done by adjusting the feet.
8
english

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the AK and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Akc

Table of Contents