Advertisement

Quick Links

Operation and installation manual
PrimoBox AZB mixing units with low-loss header
200 and 300 series in cabinets
Read the manual before using the device
Pay attention to all information regarding safety
Keep the Operation and installation manual
954.001.0001
AFRISO sp. z o.o.
Szałsza, ul. Kościelna 7
42-677 Czekanów
POLAND
Telefon +48 32 330 33 55
Fax
+48 32 330 33 51
zok@afriso.pl
www.afriso.pl

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PrimoBox AZB and is the answer not in the manual?

Questions and answers

Summary of Contents for AFRISO PrimoBox AZB

  • Page 1 Telefon +48 32 330 33 55 +48 32 330 33 51 zok@afriso.pl www.afriso.pl Operation and installation manual PrimoBox AZB mixing units with low-loss header 200 and 300 series in cabinets  Read the manual before using the device  Pay attention to all information regarding safety ...
  • Page 2: Table Of Contents

    Temperature setpoint with ATM thermostatic valve ..........19 10 Decommissioning, scrapping ................20 11 Warranty ........................ 20 12 Copyright ....................... 20 13 Customer satisfaction .................... 20 14 Addresses ......................20 PrimoBox AZB mixing units with low-loss header 200 and 300 series in cabinets...
  • Page 3: Explanations To The Installation And Operation Manual

    (direct circuits, without mixing), as well as of a lower temperature, obtained by mixing. Any other use than indicated in point 2.1 is forbidden. PrimoBox AZB mixing units with low-loss header 200 and 300 series in cabinets...
  • Page 4: Quality Control

    2.1 of assembly and use instructions, improper or faulty connection or maintenance and non- compliant operation with manufacturer's recommendations. PrimoBox AZB mixing units with low-loss header 200 and 300 series in cabinets...
  • Page 5: Product Description

    ATM thermostatic mixing valve. Two-section versions of AZB mixing units are made based on the same manifold as three-section version, but only two pairs of connections are used. PrimoBox AZB mixing units with low-loss header 200 and 300 series in cabinets...
  • Page 6: Construction

    9- cabinet 10- electrical box 11- manifold 12- zone 1 supply pipe 13- electric wires 14- zone 2 supply pipe Fig. 1: Construction of AZB 205 mixing unit PrimoBox AZB mixing units with low-loss header 200 and 300 series in cabinets...
  • Page 7: Dimensions

    Using the PrimoBox AZB mixing unit with low-loss header allows reducing the use of number of fittings and pipes necessary to perform individual installation circuits, and helps to organize and simplifie the entire installation. PrimoBox AZB mixing units with low-loss header 200 and 300 series in cabinets...
  • Page 8 (also available on the manufacturer's website). Connections for AZB mixing units heat source Fig. 3: Connections of PrimoBox AZB 351 mixing unit zone 1 zone 2 zone 3 PrimoBox AZB mixing units with low-loss header 200 and 300 series in cabinets...
  • Page 9: Hydraulic Diagram Sample

    2. Installation controller 3. Underfloor heating circuit 4. Radiator circuit Fig. 5: Sample application diagram - 2 circuits of underfloor heating system and a radiator system circuit PrimoBox AZB mixing units with low-loss header 200 and 300 series in cabinets...
  • Page 10: Specification

    The ARM ProClick electric actuators used in the AZB units comply with EU directives on low voltage electrical equipment LVD (2014/35/EU) and electromagnetic compatibility EMC (2014/31/EU). PrimoBox AZB mixing units with low-loss header 200 and 300 series in cabinets...
  • Page 11: Flow And Available Pressure Diagrams

    Fig. 6: Graph of flow rate and disposal pressure through a direct circuit Fig 7: Graph of flow rate and disposal pressure through a circuit with rotary mixing valve PrimoBox AZB mixing units with low-loss header 200 and 300 series in cabinets...
  • Page 12: Transport And Storage

    Protect against water, moisture, dirt and dust. Possibility of damage during incorrect storage. ATTENTION  Store the device in a dry and clean room.  Protect against water, moisture, dirt and dust. PrimoBox AZB mixing units with low-loss header 200 and 300 series in cabinets...
  • Page 13: Installation And Commissioning

    AZB mixing unit. Drill holes in the wall and place the dowels (included in the delivery) in them. Hang the module on the dowels. Then check the correct leveling. Fig. 9: Spacing of mounting holes PrimoBox AZB mixing units with low-loss header 200 and 300 series in cabinets...
  • Page 14: Flush Mounting

    Check whether the wall is strong and thick enough and that the PrimoBox AZB mixing kit will fit in the place you choose. To install the PrimoBox AZB mixing kit in the wall, breach the fins placed in the housing and bend them with pliers so that they are outside the unit housing (Figure 10).
  • Page 15 (Art. No. 76 110 00). The figure shows a heating col- umn built from the connected AHB and AZB units. Figure 11: Heating column: AHB + AJB + AZB units PrimoBox AZB mixing units with low-loss header 200 and 300 series in cabinets...
  • Page 16: Electrical Connections

    The number of electric wires varies depending on the number of elec- tric actuators and pumps in the set. Fig. 9: Sample distribu- tion of electric wires PrimoBox AZB mixing units with low-loss header 200 and 300 series in cabinets...
  • Page 17 (Fig. 15), then unplug the plug (Fig. 16). The plug fits into the socket only in one position. PrimoBox AZB mixing units with low-loss header 200 and 300 series in cabinets...
  • Page 18: Assembly And Disassembly Of Arm Proclick Actuators

    After putting actuator on the valve, switch back to automatic mode. Fig.18: Correct position of the rotary mixing valve when installing the actuator PrimoBox AZB mixing units with low-loss header 200 and 300 series in cabinets...
  • Page 19: Switching The Actuator To Manual Operation

    20°C 25°C 29°C 33°C 37°C 43°C Fig. 20: ATM 561 thermostatic valve knob The selected setting on the knob should correspond to the blue arrow-shaped indicator. PrimoBox AZB mixing units with low-loss header 200 and 300 series in cabinets...
  • Page 20: Decommissioning, Scrapping

    11 Warranty The manufacturer’s warranty for this product is 36 months after the date of purchase from AFRISO sp. z o.o.. In case of any alteration in the prod- uct or usage against this instruction manual, the warranty becomes void.

Table of Contents