Download Print this page

Moen RAIN FOREST Series Installation Instructions Manual page 4

Shower bar

Advertisement

3
紧定螺钉
Fixing Screw
紧定螺钉
Fixing Screw
安装杆式淋浴器:
移动管组件,使支臂组件和切换阀分别对准并套上已装好的上固
定座和下固定座上,用内六角扳手拧紧支臂组件和切换阀底部的
紧定螺钉,确认安装稳定。
Install the bar shower:
Take the bar shower, aim at the fixing ringI and fixing ringII, put the
bar shower onto the fixing rings. At the end of the arm module and
the diverter valve, there is one fixing screw, screw down it using
inner hexangular spanner.
4
接花洒软管
Connect
shower hose
此框配件供参考
须用户自备
Reference only
接金属软管
Connect flexible Hose
安装其它卫浴配件(虚线产品仅供参考):
1. 在金属软管两端的六角螺母内分别放入密封垫圈,将金属软管的
一端和淋浴龙头出水口相连接,另一端和切换阀下部前方的出水接头
相连接并拧紧,确保不泄漏。
2. 安装后请检查各连接处是否连接紧密、管道是否有泄漏,整体安
装是否牢固。确定各部良好后,可放水试用,检查连接处是否漏水。
Install other bathroom accessories:
(Dashed area for reference only)
1. Put two sealed washers respectively into the tapered nut
and hex-nut of flexible hose. Connect the tapered nut of
flexible hose with the hand shower and the hex-nut of flexible
hose with the outlet connector of diverter valve
2. Check up every step to ensure the stability and tightness to
avoid any leaking before testing the shower spray.
4
接头部花洒
Connect
shower head
放手持花洒
Lay hand shower
头部花洒
Shower head
手持花洒
Hand shower
花洒软管
Shower hose
此框配件供参考
须用户自备
Reference only
密封垫团
Sealed Washer

Advertisement

loading

This manual is also suitable for:

2256