Page 9
Apply oil all around the teeth of E12, as shown by the yellow arrows. Only a small amount of oil is needed; the oil should not be dripping off the part. ⇦ ⇨...
Page 10
Orient the parts so that both of the R letters are facing up. ⇦ ⇨...
Page 11
The orientation of E14 does not matter. Put in at. ⇦ ⇨...
Page 26
Compress the spring with A16 and align the holes of A16 and A17. ⇦ ⇨...
Page 27
Press the metal rod through the holes as shown. ⇦ ⇨...
Page 28
Pull A16 back with your finger. It should spring back. ⇦ ⇨...
Page 29
Press A14 all the way down until you hear a click. click ⇦ ⇨...
Page 30
Press down so that A16 hooks around the metal rod. ⇦ ⇨...
Page 31
1 21 Press subassembly D all the way in, aligning the four notches into the grooves of A10. Make sure the flat sides of A10 face up. IMPORTANT! Make sure this hole faces up. ⇦ ⇨...
Page 44
1 30 Turn to next page to test the cylinder before proceeding to step 31. STOP ⇦ ⇨...
Page 45
CYCLINDER TEST Make sure the piston rod has been installed correctly. 1. Insert E4 into the hole of the piston rod. 2. Place the two forks of the lever tool (E10) under E4 on either side of the piston rod. 3.
Page 46
CYCLINDER TEST Make sure the air wheel (A18) is in the correct position. 1. Place the notch of B7 all the way into the groove of the cylinder. 2. Slide the notch of B7 along the groove as shown. is is the correct position of the air wheel.
Page 47
1 31 Press all the way down, aligning the grooves. ⇦ ⇨...
Page 48
1 32 Press down so that A16 hooks around the metal rod. medium spring ⇦ ⇨...
Page 49
1 33 Use a screwdriver or other tool to press E14 down until you hear a click. click click Turn upside down to ensure that the E14 parts do not fall out. ⇦ ⇨...
Page 50
1 34 1. Confirm the orientation of E6, then press into B7 until you hear a click. click ⇦ ⇨...
Page 51
1 34 2. Confirm the orientation of E5, then press into B7 until you hear a click. click ⇦ ⇨...
Page 52
1 35 Note the difference between the parts: ⇦ ⇨...
Page 65
Place one loop of the spring (B8) over the small peg on B1. ⇦ ⇨...
Page 66
1. Apply a small amount of oil to the teeth of E11. The two half circles fit together. The small pegs on B1 lock together inside the loop of the spring. ⇦ ⇨...
Page 67
Notice the spring is on the right side of the X shape. ⇦ ⇨...
Page 68
1. Place subassembly L into A9 as shown. ⇦ ⇨...
Page 69
2. Slide it back to lock it in place. ⇦ ⇨...
Page 70
3. Place the other loop of the spring (B8) over the hook on the bottom of A9. Flip over. ⇦ ⇨...
Page 71
Place A4 as shown. Pay attention to the orientation. notched side flat side Side view Press all the way in. ⇦ ⇨...
Page 72
Push the lower sections of both purple parts inwards as you slide subassembly K onto the blaster frame. ⇦ ⇨...
Page 73
1. Slide both green sliders on subassembly H up into the locked position. ⇦ ⇨...
Page 74
2. Install subassembly H, paying attention to the orientation of the parts. flat side Notched side ⇦ ⇨...
Page 75
Hold the assembly in your hand while you place subassembly F. Press subassembly F all the way in until you hear a click. The cylinder will lock automatically. click ⇦ ⇨...
Page 76
1. Apply a small amount of oil to the teeth of E11. ⇦ ⇨...
Page 99
4. Rotate C4 counterclockwise to lock. Rotate the cap counterclockwise to lock. ⇦ ⇨...
Page 100
Fasten, but do not tighten the screws all the way. ⇦ ⇨...
Page 101
Note: the sliders on the left and right sides must be pressed all the way down. Make sure they are aligned with each other. If they are not aligned, check steps 59–63 again. Front view ⇦ ⇨...
Page 102
1. Apply oil to the top and bottom of the two E7 parts as shown. Bottom Flip over. ⇦ ⇨...
Page 103
2. Slide the tracks (E7) all the way in (see image below). ⇦ ⇨...
Page 104
3. Then place the tracks down so that their teeth mesh with the gears below. Make sure there is no gap Even a small gap at all between E7 and the here will cause a purple rail on both sides. malfunction.
Page 105
Place the neck of E19 into the semi-circular notch as shown. ⇦ ⇨...
Page 106
1. Place subassembly G, making sure to align the grooves as shown. ⇦ ⇨...
Page 107
2. To lock in place, slide backuntil you hear a click. Before Side view click After Side view ⇦ ⇨...
Page 108
Notice there are R (right) and L (left) letters on the parts. ⇦ ⇨...
Page 110
2. Place the hooks of C5 into the slots as shown. ⇦ ⇨...
Page 111
3. Slide C5 all the way back until you hear a click. click ⇦ ⇨...
Page 112
1. Line up the three holes on the right side of subassembly J as shown. Line up the other three holes and press down all the way. ⇦ ⇨...
Page 113
2. Use both hands to push subassembly J back until you hear a click. click ⇦ ⇨...
Page 114
1. Line up all six holes of C2 as shown and press down. ⇦ ⇨...
Page 115
2. Slide C2 back to lock in place. click ⇦ ⇨...
Page 116
Press B2 down until you hear a click. click click ⇦ ⇨...
Page 117
Use the ruler above to cut two pieces of tube to a length of 25 cm, and one piece of tube to 28.5 cm. 25 cm x2 28.5 cm x1 ⇦ ⇨...
Page 118
1. Place one end of a 25-cm tube on the right-most nozzle. 25 cm ⇦ ⇨...
Page 119
2. Clip the tube into the right most clip. ⇦ ⇨...
Page 120
3. Place the other end of the tube on the top right nozzle at the back of the blaster. Connect the tube to the top right nozzle in the back. ⇦ ⇨...
Page 121
1. Place one end of the 28.5-cm tube on the middle nozzle. 28.5 cm ⇦ ⇨...
Page 122
2. Clip the tube into the middle clip. ⇦ ⇨...
Page 123
3. Place the other end of the tube on the bottom nozzle at the back of the blaster. Connect the tube to the bottom nozzle in the back. ⇦ ⇨...
Page 124
1. Place one end of the other 25-cm tube on the left-most nozzle. 25 cm ⇦ ⇨...
Page 125
2. Clip the tube into the left-most clip. ⇦ ⇨...
Page 126
3. Place the other end of the tube on the top left nozzle at the back of the blaster. Connect the tube to the top left nozzle in the back. ⇦ ⇨...
Page 127
1. Place one end of the other 25-cm tube on the left-most nozzle. 2.5 cm The air tube should not be bent like this. It will affect the power of the blaster. ⇦ ⇨...