Capillary Tube - Daikin RKH35QRV16 Service Manual

2.5/3.5 kw class outdoor unit cooling only
Table of Contents

Advertisement

Si001407EB

8. Capillary Tube

Warning
Caution
Note
Step
1
Remove the terminal
cover.
Removal Procedure
Be sure to wait for 10 minutes or more after turning off all power supplies before
disassembling work.
Be careful not to get yourself burnt with the pipes and other parts that are heated by
the gas brazing machine.
If the refrigerant gas leaks during work, ventilate the room. (If the refrigerant gas is
exposed to flames, toxic gas may be generated.)
From the viewpoint of global environment protection, do not discharge the refrigerant
gas in the atmosphere. Make sure to collect all the refrigerant gas.
Restore the piping by non-oxidation brazing.
Before working, make sure that the refrigerant gas is empty in the circuit.
Be sure to apply nitrogen replacement when heating up the brazed part.
Do not use a metal saw for cutting pipes by all means because the sawdust comes into
the circuit.
When withdrawing the pipes, be careful not to pinch them firmly with pliers. The pipes
may get deformed.
Provide a protective sheet or a steel plate so that the brazing flame cannot influence
peripheries.
Be careful so as not to burn the compressor terminals, the name plate, the outdoor
heat exchanger fin.
In case of difficulty with gas brazing machine
1. Disconnect the brazed part where is easy to disconnect and restore.
2. Cut pipes on the main unit with a tube cutter in order to make it easy to disconnect.
Procedure
Points
Terminal
cover
(R20292)
Capillary Tube
13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents