PROCAM DISTRIBUTION Villa Pergola User Instructions page 15

Assembly and motorized operation
Table of Contents

Advertisement

MOUNTING AND USAGE
STEP 8
Fasten ⑪ x4 gutter connector and ② x1 (50 to 40 connector).
Connect the female and male plugs for the LED lighting (DC24V to DC24V) and motor (DC24V to
DC24V) and plug the power cable into local socket.
Main Power
DC24V
DC24V
Main Power
DC24V for motor
DC24V for light
15

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zc31-03-2ad

Table of Contents