Page 2
Dear Customer, Installation manual contains suggestions and rules for fast and exact installation of our product. We recommend you to read our instruction carefully. During installation all necessary actions have to be carried out by authorized and specialized technicians. All unauthorized interventions during warranty period will invalidate the warranty.
Page 3
INDEX 1. Symbols, Precautions and Warnings 2. Terminology 3. Packaging 4. Installation Steps 5. Programming / Resetting of Panels and Lights 6. Sensors and Automation 7. Hardware 8. Tools 9. Frequently Asked Questions 10. Risk Table...
Page 4
In case of anomalies, immediately stop the work and contact service department of Palmiye. Palmiye will not be responsible on use of non-original parts or unauthorized interventions and modifications for damage caused to people or animals or property. It is forbidden to tamper to bioclimatic pergola system.
Page 5
2. TERMINOLOGY Linear Actuator The Linear Actuators works with 24V power. The control box provides needed power each linear actuator. The control box works with 120V 230V~50/60Hz. Linear Actuators provide the movement bioclimatic pergolas. Linear Actuators are located on lateral Integrated Gutter.
Page 6
In case of anomalies, immediately stop the work and contact with hospital. Fixing elements such as screws, plugs etc. are included in the box. If not please contact service department of Palmiye. Do not use a knife to avoid the risk of ruining the paint or other materials.
Page 7
3.2.2. Panel BOM ID Description Power Pin Side Cover Cap Side Cover Cap Screw Fixed Pin Panel Profile For Skyroof Compact Series Top Gasket 3.2.3. Pillars BOM ID Description Water Output 70mm 250x250x10mm Aluminum Flange 120x120x3mm Aluminum Pillar...
Page 8
3.2.4. Boxes 1. Electrical Box Remote Controls, Sensors, Automations are on Electric box. It has a red label on the box. ELECTRIC 2. Metal Box U Brackets, Mounting brackets, Pillar caps. It has a blue label on the box. METAL 3.
4. INSTALLATION STEPS 4.1. Structure Installation Rear Integrated Gutter has escalloped completely by CNC machine in order to place to Motor tube. Escallopped for control unit box Escallopped for control unit box Rear Integrated Gutter Rear Integrated Gutter Follow related product step; 4.1.1.
Page 10
Fasten of the M12 steel rod to the wall and tighten of rods. Place the Integrated gutter to the wall mounting bracket.
Page 11
Fasten the wall mounting bracket cover on Fix by self-drilling screw to integrated gutter top and tighten by M8x25mm bolt. and wall mounting bracket. Important: All screwing should be discarded after product size control. The Final view; 4.1.2. Ceiling installation Define to ceiling mounting bracket position on the ceiling and make a hole with Ø16mm drill.
Page 12
Fasten of the M20 steel rod to the ceiling and tighten of rods; Place the Integrated gutter to the ceiling mounting bracket. M20 Nut M20 Nut M20 Steel Rod M20 Steel Rod Washer for M20 Screw Washer for M20 Screw Ceiling Mounting Bracket Ceiling Mounting Bracket Rear Integrated Gutter...
Page 13
4.1.3. Free Standing (Pillar and Integrated gutter connection) Fix Aluminium Pillar on both side and Rear Integrated Gutter on ground with M10 Sealed Nut as you see in below figure. Washer M6 Stainless Steel Washer M6 Stainless Steel Sealed Nut M6 Stainless Steel Sealed Nut M6 Stainless Steel Sealed Nut M8 Stainless Steel Sealed Nut M8 Stainless Steel...
Page 14
Important: All screwing should be discarded after product size control. Rear Integrated Gutter Rear Integrated Gutter Rear Integrated Gutter and Lateral Integrated Gutter position shown at below figure. Left Side Lateral Integrated Gutter Left Side Lateral Integrated Gutter Linear Actuator placed on the back side on lateral integrated gutter The Linear Actuator have located on rear of the gutter...
Page 15
4.1.4. Cross Check and Level Control 4.1.5. Pillar Fixing 4.1.5.1. Stainless Steel Anchorage First of all, define to exact pillar position and mark it.
Page 16
Slide the pillar then place the stainless steel anchorage to marked location. For flange installation please refer to freestanding model. Place the cap. Apply a sealant then place the At the end, fix by M4,8x25mm self-tapping pillar into the anchorage. screw.
Page 17
4.1.5.2. Hidden Anchorage Firstly, fix the hidden anchorage to the ground with 4 M12 and chemical dowels. Then, put the washers and nuts on the rods from inside and tighten them. Put the inner cover and apply sealant to the sides. Place the elbow and apply sealant.
Page 18
4.2. Panel Installation While placing the panels start front panel. The frontier panel must be connected by First panel has a gasket for perfect insulation. fixing plate to the integrated gutter. The fixing plate located on the gutter profile. Place the middle panels to escalloped lateral side integrated gutter which is shown at below figure.
Page 19
In order to protect to remove the panels, should use to 1,5mm sheet. 4.3. Control box installation Control box can be located on rear integrated gutter.
Page 20
4.4. Panel – Linear actuator connecting 40x20mm Aluminium profile must be connect to the panels. This profile allows the movement of the actuators to pass through the panels. Pin house direction should be from outside to inside, as you see at below.
Page 21
In order to block the 40x20mm Aluminium profile, must use to snap ring. It has to be placed to channel of the panel pin. Fasten Snap Ring to the panel pins Fasten Snap Ring to the panel pins 1. To connect actuator to panels, you need to give energy to control box and press calibration button.
Page 22
4.6. 2 Module or 4 module connection If there is a 2 module or 4 module, these modules are not welded to the pillar. That brackets and pillars will be sent separately. 4.6.1. 2 Module and pillar 4.6.2. 4 Module and Pillar connection connection...
Page 23
4.7. Perimeter Lighting Installation Place perimeter lighting profile to the Perimeter lighting profile should be located integrated gutter. on 6mm top of the integrated gutter. Place perimeter lighting profile Cap to related house on perimeter lighting profile. Place corner plastic between perimeter lighting profile on the corner side.
Page 24
Remove skyroof control box in gutter and find out RGB Led cabling instructions at the back of control box. Black cable is for RGB Led Lighting which has water proof socket. Open socket from middle, you will find marks ( Terminal 1,2 , PE and N) on that. Fix cables according to instructions on control board One side of socket has marks, other side has cable connection...
Page 25
4.8. Corner Cap Place the Corner Cap on the top of the integrated gutter’s joint point. 4.9. Back covering (for wall installation) Place the back-covering profile (Z bended) Then fix by M4,2x19mm self-tapping screw. Then apply a sealant between wall and back covering (Z Bended) profile. Sealant Sealant...
Power only needs to be supplied to the Control Unit Box. The receiver is completely enclosed inside the Control Unit Box. • PALMIYE Reserves the right to void the motor warranty if wiring recommendations are not followed. • The Control Box works 120 or 230 V AC / 50~60 Hz Installation Requirements •...
Page 27
5.2. Remote Control 5.2.1. Button Configurations Skyroof Compact is integrated with actuator driven with radio control, for opening, closing or stopping the panels use the respective buttons (see figure). There are 4 different remote-control models. Pure, Patio, Lounge, Modulis; •...
Page 28
5.3. Remote Types Situo 1 RTS Situo 5 RTS TELIS 16 Channels Battery Type 2430 Lithium LR03AAA Battery Voltage 1,5 V Thickness Width Height Colour Silver Silver & Pure Compatibility Compatible with a range of Somfy RTS enabled products Radio Frequence For indoor use Radio Range 433,42 MHz...
Page 30
5.4. Replacing The Battery Using a small screwdriver loosen the screws on the reverse side of the remote control and remove the back cover. Replace the battery with one 2430 Lithium 3V Battery. 5.5. Programming 5.5.1. Actuators Step 1: Select desired channel on your remote Step 2: Press the “PROGRAMMING”...
Page 31
5.5.2.1. Separation of lighting systems * (Only if Plus product has both perimeter and panel lighting) Step 1: Cut off the power entering the control box and for 10sec. supply a power again after waiting, Step 2: Select a channel you programmed both of lighting system. Step 3: If you want to leave the lighting on the selected channel, follow the steps below for other lighting;...
Page 32
5.7.2. Lighting Step 1: Press the lighting button for 3 sec Step 2: Leave it for 10 sec Step 3: Press it for 3 sec Step 4: When you leave it, wait for leds will turn on and off for 2 times Step 5: Press programming button until leds blink 2 times 5.7.2.1.
Page 33
6. SENSORS & AUTOMATION 6.1. Sensors 6.1.1. Connection to EOLIS RTS (Wind Sensor) 6.1.1.1. Cabling 6.1.1.2. Programming The motor must be in its learning mode to record an EOLIS RTS Sensor. Up to three EOLIS RTS Sensors can be memorized in a motor and one EOLIS RTS Sensor can be memorized in several motors.
Page 34
6.1.1.3. Functioning The WIND threshold can be adjusted by a potentiometer accommodate wind speed between 10 to 50km/h (6 to 31mph) • When the wind speed exceeds the threshold set by the EOLIS sensor RTS, an UP order is given to the pergola after 2 sec. •...
adjusted by two potentiometers, one for wind speed and the other for daylight intensity. • The adjustment range is between 9 – 50 km/h (6 – 31 mph) for the WIND and between 0 to 50 kilolux for the SUN •...
• Enter the “DEMO” mode • By pressing MODE button > 2 sec. > the light will start blinking for • 30 sec. + feedback motor. • Adjust the sun threshold with the potentiometer • The blinking led will be green once you have reached the current sun level. •...
Page 37
6.1.2.5. Connection to ONDEIS (Rain) sensor • Rain sensor requires a dry contact input. Our single motors (ALTUS) works with RTS • In order to use ONDEIS rain sensor you must use Dry Contact Transmitter • The RTS motors can communicate with dry contact transmitter or RS485 (multiple dry contact transmitter.
Page 38
6.2. Automation 6.2.1. Adaptable to Somfy systems Our Retractable Pergola System can control by Somfy Home Automation Smart System which is CONNEXOON® Window RTS You can download from below link: For IOS system: https://apps.apple.com/tr/app/connexoon-window-rts/id1168009218?l=tr For ANDROID system: https://play.google.com/store/apps/details?id=com.somfy.connexoon_window&gl=TR • The retractable pergola system motors can control by CONNEXOON® Window RTS application on smart phone.
Page 39
• The dry contact connector n⁰3 has per default, the RTS address n⁰3 • The dry contact connector n⁰4 has per default, the RTS address n⁰4 • The dry contact connector n⁰5 has per default, the RTS address n⁰5 • Press the programming button on the back of the RTS control point or the RTS receiver until the motor jogs.
8. TOOLS Image Product Description Product Code Palmiye T-Shirt for Installation teams HZM.ISG.G1009.BRUT Palmiye Trousers for Installation teams HZM.ISG.G1014.BRUT Palmiye Waistcoat for Installation teams HZM.ISG.G1013.BRUT to block the passage Sealant | NP1 Dark of water through the HRD.KMY.C0018.KAHV Brown surface or joints or...
Page 43
Image Product Description Product Code to fix and stabilaze M12 Rod products to ground/ HRD.CVT.G0100.ZINC wall/ceiling to fix and stabilaze M30 - Rod Galvanized products to ground/ HRD.CVT.G0105.ZINC wall/ceiling part to to fix and M12 Rondela Washer stabilaze products to HRD.CVT.G1062.PSMZ - Stainless Steel ground/wall/ceiling...
INSTALLATION TOOL LIST Tool box with wheel 1 pc Spiral grinder 1 pc Batery driller. 1 pc Electric impact drill 1 pc Lighting 2 pc Extansion lead 2 pc Ladder 2 pc Tape measure 5m 1 pc Tape measure 10m 1 pc Water gauge 2 pc...
Page 45
Allen wrench set 2 Set Socket wrench 1 pc Screw driver 1 Set Plastic hammer 1 pc Iron hammer 2 pc Electrical screw driver 2 pc Cutter 1 pc Slicon gun 2 pc Bits 2 Set PH2X100 Bits 2 pc APEX 493 A Bits 2 pc Insulating Tape (Black)
9. FREQUENTLY ASKED QUESTIONS REASON HOW TO RESOLVE? Check the switch of the current distri- The motor is not energized bution board connected to the motor is on. The product motor would not start Disconnect the power and wait for 15 The motor has no regular minutes then try to start again.
Page 47
R&D department, all of our products have been awarded the CE quality certificate. By attaching the CE mark to its products, Palmiye declares that it meets the EU safety, health, and environment requirements.
Need help?
Do you have a question about the Skyroof Compact and is the answer not in the manual?
Questions and answers