Advertisement

Quick Links

Installation Manual
Skyroof Plus
1

Advertisement

Table of Contents
loading

Summary of Contents for palmiye Skyroof Plus

  • Page 1 Installation Manual Skyroof Plus...
  • Page 2 Dear Customer, Installation manual contains suggestions and rules for fast and exact installation of our product. We recommend you to read our instruction carefully. During installation all necessary actions have to be carried out by authorized and specialized technicians. All unauthorized interventions during warranty period will invalidate the warranty.
  • Page 3 INDEX 1. Symbols, Precautions and Warnings 2. Terminology 3. Packaging 4. Installation Steps 5. Programming / Resetting of Panels and Lights 6. Sensors and Automation 7. Hardware 8. Tools 9. Frequently Asked Questions 10. Risk Table...
  • Page 4 In case of anomalies, immediately stop the work and contact service department of Palmiye. Palmiye will not be responsible on use of non-original parts or unauthorized interventions and modifications for damage caused to people or animals or property. It is forbidden to tamper to bioclimatic pergola system.
  • Page 5 2. TERMINOLOGY...
  • Page 6 Linear Actuator The Linear Actuators works with 24V power. The control box provides needed power for each linear actuator. The control box works with 120V or 230V~50/60Hz Linear Actuators provide the movement of bioclimatic pergolas. Linear Actuators are located on lateral Integrated Gutter. (see below) Also, each linear actuator has to be synchronized.
  • Page 7 In case of anomalies, immediately stop the work and contact with hospital. Fixing elements such as screws, plugs etc. are included in the box. If not please contact service department of Palmiye. Do not use a knife to avoid the risk of ruining the paint or other materials.
  • Page 8 3.2.2. Panels BOM ID Description Fixed Pin M3x16mm Rounded Head Screw Panel Cover Panel Bottom Gasket Panel Gasket Panel Profile Power Pin 3.2.3. Pillars BOM ID Description 150x150x3mm Pillar (CNC Operated for connection to Integrated Gutter) 250x250x10mm Base Plate...
  • Page 9 3.2.4. Boxes 1. Electrical Box Remote Controls, Sensors, Automations are on Electric box. It has a red label on the box. ELECTRIC 2. Metal Box U Brackets, Mounting brackets, Pillar caps. It has a blue label on the box. METAL 3.
  • Page 10: Installation Steps

    4. INSTALLATION STEPS 4.1. Structure Installation Note: Rear Integrated Gutter has escalloped completely by CNC machine in order to place to Motor tube. Escallopped for control unit box Escallopped for control unit box Rear Integrated Gutter Rear Integrated Gutter Follow related product step; 4.1.1.
  • Page 11 Fasten of the M12 steel rod to the wall and tighten of rods. Place the Integrated gutter to the wall mounting bracket.
  • Page 12 Fasten the wall mounting bracket cover on Fix by self-drilling screw to integrated gutter top and tighten by M8x25mm bolt. and wall mounting bracket. Important: All screwing should be discarded after product size control. The Final view; 4.1.3. Ceiling installation Define to ceiling mounting bracket position on the ceiling and make a hole with Product Width Product Width...
  • Page 13 Fasten of the M20 steel rod to the ceiling and tighten of rods; Place the Integrated gutter to the ceiling mounting bracket. M20 Nut M20 Nut M20 Steel Rod M20 Steel Rod Washer for M20 Screw Washer for M20 Screw Ceiling Mounting Bracket Ceiling Mounting Bracket Rear Integrated Gutter...
  • Page 14 4.1.4. Free Standing (Pillar and Integrated gutter connection) Fix Aluminium Pillar on both side and Rear Integrated Gutter on ground with M10 Sealed Nut as you see in below figure. M10 Washer Stainless Steel M10 Washer Stainless Steel M10 Nut Stainless Steel M10 Nut Stainless Steel Sealant Sealant...
  • Page 15 Important: All screwing should be discarded after product size control. Rear Integrated Gutter and Lateral Integrated Gutter position shown at below figure. Rear Integrated Gutter Rear Integrated Gutter Left Side Lateral Integrated Gutter Left Side Lateral Integrated Gutter Linear Actuator placed on the back side on lateral integrated gutter which is shown at below figure.
  • Page 16 The fixing Lateral side integrated gutter to rear integrated gutter with M10 Sealed Nut. 4.1.5. Cross Check and Level Control...
  • Page 17 4.1.6. Pillar Fixing 4.1.6.1. Stainless Steel Anchorage First of all, define to exact pillar position and mark it. Slide the pillar then place the stainless steel anchorage to marked location. For flange installation please refer to freestanding model.
  • Page 18 Place the cap. Apply a sealant then place the At the end, fix by M4,8x25mm self-tapping pillar into the anchorage. screw. • 4.1.6.2. Hidden Anchorage Firstly, fix the hidden anchorage to the ground with 4 M12 and chemical dowels. Then, put the washers and nuts on the rods from inside and tighten them.
  • Page 19 Fix with 4 M8x25 mm round head bolts from 3 sides. 4.2. Panel Installation While placing the panels start front panel. First panel has a gasket for perfect insulation. Start place from front panel Start place from front panel The front panel has a gasket for perfect insulation The front panel has a gasket for perfect insulation...
  • Page 20 The front panel has a short pin as last 3 panels The front panel has a short pin as last 3 panels The frontier panel must be connected by Place the middle panels to escalloped lateral fixing plate to the integrated gutter. The fixing side integrated gutter which is shown at plate located on the gutter profile.
  • Page 21 If you have lighting system, Pannel's lighting cable should be inside of this plastic cover Pannel's lighting cable should be inside of this plastic cover LED’s cable must through from plastic cover The last 3 panel pins are shorter than middle panels because of the reason is that prevent the pins from striking the linear actuator.
  • Page 22 Place rear covering to rear integrated gutter.
  • Page 23 Control box covering profile ensures that protect the control unit box. This profile places as defined at below. Motor konulduktan sonar enerji verilmeli, Kalibrasyon yapılıp programlama yapılmalı. Programlama bölümüne yönlendir. Please refer to Programming section. 40x20mm Aluminium profile must be connect to the panels. This profile allows the movement of the actuators to pass through the panels.
  • Page 24 house direction should be from outside to inside, as you see at below. In order to block the 40x20mm Aluminium profile, must use to snap ring. It has to be placed to channel of the panel pin. Place and fasten to clamp for last 3 panels.
  • Page 25 In the motor connection profile and 40x20 profile connection, the holes must catch up with each other. For this, the motors must be moved with the help of the remote control. Fasten 16mm snap ring to motor connector Fasten 16mm snap ring to motor connector 1.
  • Page 26 4.4. Back covering (for wall installation) Place the back-covering profile (Z bended)
  • Page 27 Then fix by M4,2x19mm self-tapping screw. Then apply a sealant between wall and back covering (Z Bended) profile. Sealant Sealant 4.5. Middle Pillar Connection If your projection bigger than 579,9cm (19’) or you want to add a middle pillar to the structure, it will be able to connect with U bracket as you see in below picture.
  • Page 28 4.6. 2 Module or 4 module connection If there is a 2 module or 4 module, these modules are not welded to the pillar. That brackets and pillars will be sent separately. 4.6.1. 2 Module and pillar 4.6.2. 4 Module and Pillar connection connection 4.7.
  • Page 29 Perimeter lighting profile should be located on 6mm (15/64”) top of the integrated gutter. Place perimeter lighting profile Cap to related house on perimeter lighting profile. Place corner plastic between perimeter lighting profile on the corner side.
  • Page 30 Remove skyroof control box in gutter and find out RGB Led cabling instructions at the back of control box. Black cable is for RGB Led Lighting which has water proof socket. Open socket from middle, you will find marks ( Terminal 1,2 , PE and N) on that. Fix cables according to instructions on control board One side of socket has marks, other side has cable connection...
  • Page 31 4.8. Corner Cap Place the Corner Cap on the top of the integrated gutter’s joint point.
  • Page 32: Installation Requirements

    Power only needs to be supplied to the Control Unit Box. The receiver is completely enclosed inside the Control Unit Box. • PALMIYE Reserves the right to void the motor warranty if wiring recommendations are not followed. • The Control Box works 120 or 230 V AC / 50~60 Hz Installation Requirements •...
  • Page 33 5.2. Remote Control 5.2.1. Button Configurations Skyroof Plus is integrated with actuator driven with radio control, for opening, closing or stopping the panels use the respective buttons (see figure). There are 4 different remote-control models. Pure, Patio, Lounge, Modulis; •...
  • Page 34 5.3. Remote Types Situo 1 RTS Situo 5 RTS TELIS 16 Channels Battery Type 2430 Lithium LR03AAA Battery Voltage 1,5 V Thickness Width Height Colour Silver Silver & Pure Compatibility Compatible with a range of Somfy RTS enabled products Radio Frequence For indoor use Radio Range 433,42 MHz...
  • Page 36 5.4. Replacing The Battery Using a small screwdriver loosen the screws on the reverse side of the remote control and remove the back cover. Replace the battery with one 2430 Lithium 3V Battery. 5.5. Programming 5.5.1. Actuators Step 1: Select desired channel on your remote Step 2: Press the “PROGRAMMING”...
  • Page 37 Step 2: Select a channel you programmed both of lighting system. Step 3: If you want to leave the lighting on the selected channel, follow the steps below for other lighting; Step 3.1: Cut off the power as 3sec, Step 3.2: Supply a power as 10 sec., Step 3.3: Cut off the power as 3sec.
  • Page 38 5.8.2.1. RGB LED Resetting Press the programming button on the panel for 5 seconds, then press the programming button on the back of the remote for 2 seconds. 5.9. Using of Remote Control: 5.9.1. Using of Lights • “UP” button: It’s ensures Activate on your lighting system. When you press constantly “UP” button, the LED lights will up through DIMMING feature.
  • Page 39 6. SENSORS & AUTOMATION 6.1. Sensors 6.1.1. Connection to EOLIS RTS (Wind Sensor) 6.1.1.1. Cabling 6.1.1.2. Programming The motor must be in its learning mode to record an EOLIS RTS Sensor. Up to three EOLIS RTS Sensors can be memorized in a motor and one EOLIS RTS Sensor can be memorized in several motors.
  • Page 40 6.1.1.3. Functioning The WIND threshold can be adjusted by a potentiometer accommodate wind speed between 10 to 50km/h (6 to 31mph) • When the wind speed exceeds the threshold set by the EOLIS sensor RTS, an UP order is given to the pergola after 2 sec. •...
  • Page 41: Setting Instructions

    adjusted by two potentiometers, one for wind speed and the other for daylight intensity. • The adjustment range is between 9 – 50 km/h (6 – 31 mph) for the WIND and between 0 to 50 kilolux for the SUN •...
  • Page 42: Mounting Instructions

    • Enter the “DEMO” mode • By pressing MODE button > 2 sec. > the light will start blinking for • 30 sec. + feedback motor. • Adjust the sun threshold with the potentiometer • The blinking led will be green once you have reached the current sun level. •...
  • Page 43 6.1.2.5. Connection to ONDEIS (Rain) sensor • Rain sensor requires a dry contact input. Our single motors (ALTUS) works with RTS • In order to use ONDEIS rain sensor you must use Dry Contact Transmitter • The RTS motors can communicate with dry contact transmitter or RS485 (multiple dry contact transmitter.
  • Page 44 6.2. Automation 6.2.1. Adaptable to Somfy systems Our Retractable Pergola System can control by Somfy Home Automation Smart System which is CONNEXOON® Window RTS You can download from below link: For IOS system: https://apps.apple.com/tr/app/connexoon-window-rts/id1168009218?l=tr For ANDROID system: https://play.google.com/store/apps/details?id=com.somfy.connexoon_window&gl=TR • The retractable pergola system motors can control by CONNEXOON® Window RTS application on smart phone.
  • Page 45 • The dry contact connector n⁰3 has per default, the RTS address n⁰3 • The dry contact connector n⁰4 has per default, the RTS address n⁰4 • The dry contact connector n⁰5 has per default, the RTS address n⁰5 • Press the programming button on the back of the RTS control point or the RTS receiver until the motor jogs.
  • Page 46 7. HARDWARE 7.1. Integrated gutter – Pillar connection M10 nut Stainless Steel M10 washer Stainless Steel M10 washer M10 washer M10 nut M10 nut 7.2. Wall bracket – Integrated Gutter M8x25mm Bolt M4,8x25mm self-drilling screw M8x25mm Bolt M8x25mm Bolt Rear Integrated Gutter Rear Integrated Gutter M12 Steel rod M12 Steel rod...
  • Page 47 7.3. Ceiling Bracket – Integrated Gutter connection M20x50mm bolt M20 nut Washer for M20 bolt M20 Nut M20 Nut M20 Steel Rod M20 Steel Rod Washer for M20 screw Washer for M20 screw M20x50mm screw M20x50mm screw Ceiling Mounting Bracket Ceiling Mounting Bracket Rear Integrated Gutter Rear Integrated Gutter...
  • Page 48 7.5. Linear Actuator Connector– 40x20mm Profile connection M12x50mm hexagonal bolt stainless steel M10 Washer Stainless Steel M12x35mm hexagonal head bolt M12x35mm hexagonal head bolt M12 washer Stainless-steel M12 washer Stainless-steel 7.6. 40x20mm Profile – Panel Connection 8mm Snap ring Snap Ring Snap Ring...
  • Page 49: Product Code

    8. TOOLS Image Product Description Product Code Palmiye T-Shirt for Installation teams HZM.ISG.G1009.BRUT Palmiye Trousers for Installation teams HZM.ISG.G1014.BRUT Palmiye Waistcoat for Installation teams HZM.ISG.G1013.BRUT to block the passage Sealant | NP1 Dark of water through the HRD.KMY.C0018.KAHV Brown surface or joints or...
  • Page 50 Image Product Description Product Code to anchor rods to Epoxy HRD.KMY.G1027.BRUT concrete to fix and stabilaze M12 Rod products to ground/ HRD.CVT.G0100.ZINC wall/ceiling to fix and stabilaze M30 - Rod Galvanized products to ground/ HRD.CVT.G0105.ZINC wall/ceiling part to to fix and M12 Rondela Washer stabilaze products to HRD.CVT.G1062.PSMZ...
  • Page 51: Installation Tool List

    INSTALLATION TOOL LIST Tool box with wheel 1 pc Spiral grinder 1 pc Batery driller. 1 pc Electric impact drill 1 pc Lighting 2 pc Extansion lead 2 pc Ladder 2 pc Tape measure 5m 1 pc Tape measure 10m 1 pc Water gauge 2 pc...
  • Page 52 Allen wrench set 2 Set Socket wrench 1 pc Screw driver 1 Set Plastic hammer 1 pc Iron hammer 2 pc Electrical screw driver 2 pc Cutter 1 pc Slicon gun 2 pc Bits 2 Set PH2X100 Bits 2 pc APEX 493 A Bits 2 pc Insulating Tape (Black)
  • Page 53: Frequently Asked Questions

    9. FREQUENTLY ASKED QUESTIONS REASON HOW TO RESOLVE? Check the switch of the current distri- The motor is not energized bution board connected to the motor is on. The product motor would not start Disconnect the power and wait for 15 The motor has no regular minutes then try to start again.
  • Page 54 R&D department, all of our products have been awarded the CE quality certificate. By attaching the CE mark to its products, Palmiye declares that it meets the EU safety, health, and environment requirements.
  • Page 56 www.palmiye.eu...

Table of Contents