  • Page 2 Dear Customer, Installation manual contains suggestions and rules for fast and exact installation of our product. We recommend you to read our instruction carefully. During installation all necessary actions have to be carried out by authorized and specialized technicians. All unauthorized interventions during warranty period will invalidate the warranty.
  • Page 3: Table Of Contents

    INDEX 1. Symbols, Precautions and Warnings 2. Terminology 3. Packaging 4. Installation Steps 5. Programming / Resetting of Panels and Lights 6. Sensors and Automation 8. Tools 9. Frequently Asked Questions 10. Risk Table...
  • Page 4: Symbols, Precautions And Warnings

    In case of anomalies, immediately stop the work and contact service department of Palmiye. Palmiye will not be responsible on use of non-original parts or unauthorized interventions and modifications for damage caused to people or animals or property. It is forbidden to tamper to bioclimatic pergola system.
  • Page 5: Terminology

    2. TERMINOLOGY The Motor works with 120V/60Hz or 230V50Hz. If you have a lighting option, you need to use the lighting control box. The control box works with 120V/60Hz or 230V/50Hz...
  • Page 6: Packaging

    In case of anomalies, immediately stop the work and contact with hospital. Fixing elements such as screws, plugs etc. are included in the box. If not please contact service department of Palmiye. Do not use a knife to avoid the risk of ruining the paint or other materials.
  • Page 7 3.2.2. Panels There are 3 different packed panels. 3.2.2.1. Frontier panel 3.2.2.2. Middle panel 3.2.2.3. Back panel Frontier Panel Frontier Panel Last Panel Last Panel Middle Panel Middle Panel 3.2.3. Pillars BOM ID Description 150x150x3mm Pillar (CNC Operated for connection to Integrated Gutter) 250x250x10mm Base Plate...
  • Page 8 3.2.4. Boxes 1. Electrical Box Control Unit Box and Remote Controls are on Electric box. It has a red label on the box. ELECTRIC 2. Metal Box U Brackets, Mounting brackets, Pillar caps. It has a blue label on the box. METAL 3.
  • Page 9: Installation Steps

    4. INSTALLATION STEPS 4.1. Structure Installation Note: Rear Integrated Gutter has escalloped completely by CNC machine in order to place to Motor tube. Escallopped for control unit box Escallopped for control unit box Rear Integrated Gutter Rear Integrated Gutter Follow related product step; 4.1.1.
  • Page 10 Fasten of the M12 steel rod to the wall and tighten of rods. Place the Integrated gutter to the wall mounting bracket.
  • Page 11 Fix by self-drilling screw to integrated gutter Fasten the wall mounting bracket cover on and wall mounting bracket. top and tighten by M8x25mm bolt. Important: All screwing should be discarded after product size control. The Final view; 4.1.2. Ceiling installation Define to ceiling mounting bracket position on the ceiling and make a hole with Ø16mm drill.
  • Page 12 Fasten of the M20 steel rod to the ceiling and tighten of rods; Place the Integrated gutter to the ceiling mounting bracket. M20 Nut M20 Nut M20 Steel Rod M20 Steel Rod Washer for M20 Screw Washer for M20 Screw Ceiling Mounting Bracket Ceiling Mounting Bracket Rear Integrated Gutter...
  • Page 13 4.1.3. Free Standing (Pillar and Integrated gutter connection) Fix Aluminium Pillar on both side and Rear Integrated Gutter on ground with M10 Sealed Nut as you see in below figure. M10 Washer Stainless Steel M10 Washer Stainless Steel M10 Nut Stainless Steel M10 Nut Stainless Steel Sealant Sealant...
  • Page 14 Important: All screwing should be discarded after product size control. Rear Integrated Gutter and Lateral Integrated Gutter position shown at below figure. Rear Integrated Gutter Rear Integrated Gutter Left Side Lateral Integrated Gutter Left Side Lateral Integrated Gutter The fixing Lateral side integrated gutter to rear integrated gutter with M10 Sealed...
  • Page 15 4.1.4. Cross Check and Level Control...
  • Page 16 4.1.5. Pillar Fixing 4.1.5.1. Stainless Steel Anchorage First of all, define to exact pillar position and mark it. Slide the pillar then place the stainless steel anchorage to marked location. For flange installation please refer to freestanding model.
  • Page 17 Place the cap. Apply a sealant then place the At the end, fix by M4,8x25mm self-tapping pillar into the anchorage. screw. 4.1.5.2. Hidden Anchorage Firstly, fix the hidden anchorage to the ground with 4 M12 and chemical dowels. Then, put the washers and nuts on the rods from inside and tighten them.
  • Page 18 Fix with 4 M8x25 mm round head bolts from 3 sides. 4.2. Panel Installation Place a special designed gasket to corners. While placing the panels start from rear. The rear panel has a short pin.
  • Page 19 There should be short pin house plate. Firstly, you should fix to rear panel short pin house. Then, place the short pin to house and fix its clamp by M5 countersunk head bolt. Then, place the middle panels to the rail located on gutter profile one by one and fix with M10 special bolt.
  • Page 20 4.3. Motor House Placing There should be a gear house in correct side. The houses have to be aligned with projection direction. The bracket’s nail has to be fitted as an exact. After that place the washer and fasten the nuts.
  • Page 21 4.4. Front Mechanism House Placing There should be a bracket in correct side. The bracket’s nail has to be fitted as an exact. After that place the washer and fasten the nuts.
  • Page 22 4.5. Front Gear Placing Place a front gear to front mechanism house. Turn and place the stretching bolts. Important: Before the Front Gear is inserted, the belt must be passed between the housing and the front gear. The stretching bolts must be place related area.
  • Page 23 4.6. Place the Motor Tube set The motor tube set has to be on rear. It has a square plate and it must be fit on the rear mechanism house as you see at below. 4.7. Belt installation: The belt is prepared an exact size. The belt should cover the front and back gear. The connection point should be on center of the locomotive carrier.
  • Page 24 Fasten the brackets by stay bolt and countersunk head bolt. Belt stretching; That bolts ensures a stretch to the belt.
  • Page 25 To be sure same stretch level of the bolt on both sides. 4.8. Side covering bottom profile installation If there is a perimeter lighting, the lighting control box should be placed on the profile as you see at below. The cables should go from the corner.
  • Page 26 4.9. Corner cap placing The corner cap should be on front. Fix by M2,9x13mm rounded head screw to prepared plate. To place corner cap, you should move panels back. Refer to motor programming. 4.10. Motor tube covering profile placing That profile should be on rear and fix by M2,9x13mm screw. 4.11.
  • Page 27 4.12. Motor tube rear covering profile installation If there is a perimeter lighting, the lighting control box should be placed on the profile as you see at below. The cables should go from the corner. 4.13. Front covering profile installation To place corner cap, you should move panels back.
  • Page 28 4.14. Front covering profile installation If your projection bigger than 579,9cm (19’) or you want to add a middle pillar to the structure, it will be able to connect with U bracket as you see in below picture. Middle pillar Middle pillar 4.15.
  • Page 29 4.16. 2 Module or 4 module connection If there is a 2 module or 4 module, these modules are not welded to the pillar. That brackets and pillars will be sent separately. 4.16.1. 2 Module and pillar connection 4.16.2. 4 Module and Pillar connection...
  • Page 30 4.17. Perimeter Lighting Installation Place perimeter lighting profile to the integrated gutter. Place perimeter lighting profile to the integrated gutter. Place perimeter lighting profile Cap to related house on perimeter lighting profile.
  • Page 31 Place corner plastic between perimeter lighting profile on the corner side.
  • Page 32: Programming / Resetting Of Panels And Lights

    Use only SOMFY RTS radio controls. The receiver (433,42 MHz) must be programmed with transmitters. 5.2. Remote Control Button Configurations Skyroof Prestige is integrated with linear tube motor with radio control for opening, closing or stopping the fabric support profiles use the respective buttons (see figure). There are 4 different remote-control models.
  • Page 33 5.3. Remote Types Situo 1 RTS Situo 5 RTS TELIS 16 Channels Battery Type 2430 Lithium LR03AAA Battery Voltage 1,5 V Thickness Width Height Colour Silver Silver & Pure Compatibility Compatible with a range of Somfy RTS enabled products Radio Frequence For indoor use Radio Range 433,42 MHz...
  • Page 35 5.4. Replacing The Battery Using a small screwdriver loosen the screws on the reverse side of the remote control and remove the back cover. Replace the battery with one 2430 Lithium 3V Battery. 5.5. Programming 5.5.1. Panels Step 1: It has to be connected directly to electric power unit (120VAC/60Hz or 230VAC/50Hz). Notice the motor will not respond to any transmitter until a transmitter is assigned to communicate with the motor.
  • Page 36 5.5.1.1. Programming of Lights (Perimeter Lights) Step 1: Give energy to control box Step 2: Give energy for at least 4 second and you will hear a click from control box Step 1: Power off and power on 5 times max. within 5 sec. Step 2: Leave while power ON.
  • Page 37: Sensors And Automation

    6. SENSORS & AUTOMATION 6.1. Sensors 6.1.1. Connection to EOLIS RTS (Wind Sensor) 6.1.1.1. Cabling 6.1.1.2. Programming The motor must be in its learning mode to record an EOLIS RTS Sensor. Up to three EOLIS RTS Sensors can be memorized in a motor and one EOLIS RTS Sensor can be memorized in several motors.
  • Page 38 6.1.1.3. Functioning The WIND threshold can be adjusted by a potentiometer accommodate wind speed between 10 to 50km/h (6 to 31mph) • When the wind speed exceeds the threshold set by the EOLIS sensor RTS, an UP order is given to the pergola after 2 sec. •...
  • Page 39 adjusted by two potentiometers, one for wind speed and the other for daylight intensity. • The adjustment range is between 9 – 50 km/h (6 – 31 mph) for the WIND and between 0 to 50 kilolux for the SUN •...
  • Page 40 • 30 sec. + feedback motor. • Adjust the sun threshold with the potentiometer • The blinking led will be green once you have reached the current sun level. • The level you set will be the one to set off the sun function •...
  • Page 41 6.1.2.4. Connection to ONDEIS (Rain) sensor • Rain sensor requires a dry contact input. Our single motors (ALTUS) works with RTS • In order to use ONDEIS rain sensor you must use Dry Contact Transmitter • The RTS motors can communicate with dry contact transmitter or RS485 (multiple dry contact transmitter.
  • Page 42 • The retractable pergola system motors can control by CONNEXOON® Window RTS application on smart phone. • CONNEXOON® Window RTS device has to connect to the Ethernet modem connection. • Download it, • Create an account, • Log in to the system, •...
  • Page 43: Tools

    7. TOOLS Image Product Description Product Code Palmiye T-Shirt for Installation teams HZM.ISG.G1009.BRUT Palmiye Trousers for Installation teams HZM.ISG.G1014.BRUT Palmiye Waistcoat for Installation teams HZM.ISG.G1013.BRUT to block the passage Sealant | NP1 Dark of water through the HRD.KMY.C0018.KAHV Brown surface or joints or...
  • Page 44 Image Product Description Product Code to anchor rods to Epoxy HRD.KMY.G1027.BRUT concrete to fix and stabilaze M12 Rod products to ground/ HRD.CVT.G0100.ZINC wall/ceiling to fix and stabilaze M30 - Rod Galvanized products to ground/ HRD.CVT.G0105.ZINC wall/ceiling part to to fix and M12 Rondela Washer stabilaze products to HRD.CVT.G1062.PSMZ...
  • Page 45 INSTALLATION TOOL LIST Tool box with wheel 1 pc Spiral grinder 1 pc Batery driller. 1 pc Electric impact drill 1 pc Lighting 2 pc Extansion lead 2 pc Ladder 2 pc Tape measure 5m 1 pc Tape measure 10m 1 pc Water gauge 2 pc...
  • Page 46 Allen wrench set 2 Set Socket wrench 1 pc Screw driver 1 Set Plastic hammer 1 pc Iron hammer 2 pc Electrical screw driver 2 pc Cutter 1 pc Slicon gun 2 pc Bits 2 Set PH2X100 Bits 2 pc APEX 493 A Bits 2 pc Insulating Tape (Black)
  • Page 47: Frequently Asked Questions

    7. FREQUENTLY ASKED QUESTIONS REASON HOW TO RESOLVE? Check the switch of the current distri- The motor is not energized bution board connected to the motor is on. The product motor would not start Disconnect the power and wait for 15 The motor has no regular minutes then try to start again.
  • Page 48: Risk Table

    R&D department, all of our products have been awarded the CE quality certificate. By attaching the CE mark to its products, Palmiye declares that it meets the EU safety, health, and environment requirements.