Page 1
INSTRUCTION ASSEMBLY Swing Canopy Hammock ITEM CODE: SS63002 For any assistance with assembly or for missing parts please Contact with us Email: patiopostservice@lhgst.com Web: www.lhgst.com Adress:No.99 South Heyang Road,Dayang Street, Linhai,zhejiang,China Page 1...
PRE-ASSEMBLY PREPARATION Before you start: 1.Choose a clean, level, spacious assembly area. Avoid hard surfaces that may damage the product 2.Take care when lifting. Product should be assembled as near as possible to the point of use 3.Ensure that you have all required contents for complete assembly 4.Always read the assembly instructions carefully before beginning assembly.
Page 5
You will need Step 1 • Prepare a floor or surface with a blanket or cardboard. • Connecting forelegs(A) to rear foot(B) as shown below. • Secure fixing points with bolt (R )set for point. Thread 2xbolt(R)and fasten with Allen Key(W). •...
Page 6
Step 2 You will need • Connect the legs to the top beam as shown below, Insert the top beam(G) into legs. • Secure outside fixing points with bolt Use bolt(P)thread through and fasten by Allen Key(W) • Repeat for the other set. Page 6...
Page 7
Step 3 You will need • Secure inside fixing points with bolt Use (P) by thread through and Lock in the other end with washer(Y) ,spring washer(Z),nut(Z₁) and screw cover(X), fasten by Allen Key(W) and Wrench(K). • Repeat for the other set. Page 7...
Page 8
Step 4 You will need • Insert the foot connecting rod(E) into forelegs(A) and rear foot(B). • Secure fixing points with bolt (U)by thread through and fasten by Allen Key(W). • Repeat for the other set. Page 8...
Page 9
Step 5 You will need • Insert the back link(D)into the frame ,as shown below • Insert bolt(S) through the holes in the legs, as shown below, on both end of the frame. Fasten with Allen key(W). Page 9...
Page 10
Step 6 You will need • Thread the 2x top links(G) through the tarpaulin(L) as shown below • Insert the curved connect bar(F) to the each end of the tarpaulin. • Secure the connect point with bolt (S),thread through the holes on connect bar and fasten with the Allen Key(W).
Page 11
Step 7 You will need • With the aid of a 2 person, lift and attach finished the tarpaulin to the swing frame • Secure the connecting point with adjustable handle(M),thread handle (M) through plastic washer(N) as shown below. • Repeat the steps for other end.
Page 12
Step 8 You will need • Attach 2 armrest(I) to the base (J)and back plate(J₁ ). • Secure the base plate (J)and back plate(J₁ )to the armrest with 4x bolt(Q) threaded from the outside in. Fasten with Allen key(W). • Repeat for other armrest. Page 12...
Page 13
Step 9 You will need • With the aid of a 2 person, lift and attach the seat to the top beam, as shown below. • Secure the connect point bolt(T) threaded from the outside in. Lock the other end with washer(O) and nut(V). Fasten with Allen key(W) and Wrench(K).
Page 14
Step 10 You will need • Place the cushion(I) onto the swing. Page 14...