Download Print this page

SAMSGAZEBOS 10-OCT-E-CUPOLA Assembly Instructions Manual

10' octagon gazebo #e two-tiered roof for an uneven patio

Advertisement

Quick Links

S
G
AMS
10' Octagon Gazebo #E two- ered roof for an uneven pa o
Assembly Instruc ons
10-OCT-E-CUPOLA
Visit our web sites, www.SamsGazebos.com and www.SamsGazebo.com
S
AMS
132 E. 163rd Street, Gardena, CA 90248
Customer Service: (800) 376-7267
Monday ~ Friday: 8:00~ 6:00, Saturday: 10:00 ~ 4:00 (Pacific Standard Time)
TM
AZEBOS
G
TM
AZEBOS
1
10-OCT-E
info@samsgazebos.com

Advertisement

loading

Summary of Contents for SAMSGAZEBOS 10-OCT-E-CUPOLA

  • Page 1 AZEBOS 10’ Octagon Gazebo #E two- ered roof for an uneven pa o Assembly Instruc ons 10-OCT-E 10-OCT-E-CUPOLA Visit our web sites, www.SamsGazebos.com and www.SamsGazebo.com AZEBOS 132 E. 163rd Street, Gardena, CA 90248 Customer Service: (800) 376-7267 info@samsgazebos.com Monday ~ Friday: 8:00~ 6:00, Saturday: 10:00 ~ 4:00 (Pacific Standard Time)
  • Page 2: Before Assembly

    All steps can be completed in five hours by two people. If you have a level floor such as wood deck, e-mail us at info@samsgazebos.com at the me of order; we can make all posts same complete with hardware necessary at no extra charge.
  • Page 3 10’ Octagon Gazebo #E two- ered roof List of Parts Standard Post Longer Post This is line 1, standard post length. 8 Headers 8 Posts: 1 standard and 7 longer Outside Inside 8 Large Ra ers 8 Post Bases (One is fastened to the standard post.) Do not handle the roof sec on by the 1 x 6 roof peak;...
  • Page 4 Top Rail Rail 16 Corbels (8 right & 8 le ) 5 Rails & 5 Top Rails 2 Wood Pieces, 1 small and 1 large, 8 Small Ra ers for Upper Roof Panels & 1 small 4x4 for leveling 8 Temporary Post Holders 8 Hanger Bolts (fastened to the posts) 8 Upper Roof Panels 16 Washers (8 Large, 8 Small) &...
  • Page 5 2 Temporary Rail Holders 1 Cupola (op onal) 8 “L” Post Connectors 8 3/8” Wedge Anchors, 8 3/8” Lag Bolts & Washers Washers, & Nuts Nails : 32 Small for the Header 8 Header Connectors Screws: 32 Small for the bo om Connectors, 32 Medium for of the roof panels &...
  • Page 6 Bonus: 16 Temporary Ridges Install them un l you install your roofing material (8 large for the lower roof ridges & 8 small for the upper roof ridges) For addi onal water protec ons, you will also need: 1 Roll of Roofing Paper 4 Bundles of Composite (Asphalt) Shingles (net 104 sq.
  • Page 7 This is a template for post posi ons. Rotate it to face your house or pathway. Front Entrance 1. Sweep the area where the gazebo will be installed; it is easy 2. Lay out the eight headers in an octagon shape. The gazebo to work on a pa o without any debris.
  • Page 8 7. Trace both the inside and the outside of the headers with a pen- 8. Repeat step 7 for the other seven headers. cil. The lines will determine the permanent posi on of the gazebo. Taping your level to the longer piece is recommended.
  • Page 9 IMPORTANT: This corner marked at top is the lowest so that a post will be longest. This corner is the highest and the standard post 1 will be installed. 13. The lines indicate the height differences of the eight corners. 14.
  • Page 10 Post Line 1 The other posts should be LONGER than the line 1, the standard post 1. 19. Lay the small leveling wood piece and a post together and align 20. Extend the line 2 around the perimeter to the other sides of “line 1”.
  • Page 11 25. Label the post, headers, and the corners “2”. Labeling 26. Go to the next corner and repeat steps 17~ 24 for posts them is the best way to avoid confusion. 3 ~ 8, and label each post in the sequen al numerical order. Your lines may look different depending on a...
  • Page 12 31. Remove the temporary nails and screws from the headers 32. Sweep the dust away from drilling the holes. and move the headers outwards. 34. Sweep the dust away again. 33. Drill 1-1/2” deep where you previously drilled in step 29. The line should be directly over the drilled holes.
  • Page 13 Outside 37. Start installing the posts. It is crucial that you install the 38. Let the bolt of the post base slip into the hole. right posts to the correct labeled corner. Inside Outside 39. Align the diagonal pencil line to the center of the post 40.
  • Page 14: Socket Wrench

    Socket Wrench 43. Fasten the L post connector to the post with a lag bolt. 44. Insert a wedge anchor into the newly drilled hole and hammer it in. Temporary Post Holder 46. Go to the next post and repeat steps 38 ~ 45. Put a tem- 45.
  • Page 15 Post Rail Outside 49. Hold up the rail with temporary rail holders from the 50. Push the rail to the post from the outside towards the outside of the base as posts. inside of the fi ng. 1 large screw 1 large screw each end each end...
  • Page 16 Outside 2 large nails on 2 large screws for each header each header 56. Now fasten the headers with large screws. 55. Temporarily fasten these headers with nails to prevent shi ing while you fasten the headers with screws. 2 large screws for each header Inside 57.
  • Page 17 2 large screws for each ra er 62. Fasten the ra er from both sides with large screws. 61. Hammer the ra er down into the fi ng. Ra er Tops 4 large nails for each ra er 63. Install ra ers one a er another. Adjust ra er top posi ons 64.
  • Page 18: Interior View

    Interior View Top View 1 large screw for each ra er 67. Upon complete installa on of the ra ers, they should 68. Fasten the ra er tops to each other with large screws. form a perfect octagon as seen above. 69.
  • Page 19 4 medium nails for each bo om ra er Do not handle the roof sec on by the roof peak; it is fragile. 73. Fasten the upper ra ers to the other ra ers from both 74. Install the upper roof panels with rough sides facing in- sides with medium nails.
  • Page 20 3 large screws on each upper ridge 4 large screws on each lower ridge 80. Be sure to properly align them. Finish and enjoy the sea- 79. Fasten the temporary ridges to 1 x 6 roof panels and the ra ers with large screws. sons.

This manual is also suitable for:

10-oct-e