Page 1
2 End Frames 2 End Floor Boards with Ears Hardware (4 lag bolts, 2 large, 3 medium, 36 small screws) is also included. Thank you for purchasing a SamsGazebos garden bridge. ○ Assembling this bridge kit may take 45 minutes with a cordless screw driver.
Page 2
End Frame Rail Start assembling the rails and end frames. 2. Match the number for the optimal results. CAUTION: Do NOT fasten the bolt too tightly; The lag bolt could cave in and damage the post, rail, or end-frame. 4. Be sure to set the end of the rail and end frame flush 3.
Page 3
7. Slide in the small floor joist from the bottom. 8. Pull the rail up if the fit is tight. Match the number. 9. Hammer the small floor joist from the bottom. 10. Be sure to set the both end of the small floor joist flush to the bottom of the groove for the floor boards to slide in.
Page 4
Set the end frame and large floor joist flush. 13. Put the large floor joist. Match the number. 14 . Fasten the large floor joist and the end frame with a medium screw. Do the same on the other side Match the number and turn it over to fasten it with small screws.
Page 5
Fasten screws toward rails Check if the tongue and groove of each floor board properly fit before fastening the end floor board. Fasten screws straight down Fasten screws toward rails 19. Turn over the end floor board and tighten the fit. 20.
Page 6
Another web site is just launched, www.SamsGazebo.com. We appreciate your business and look forward to receiving your fabulous reviews. AZEBOS.com 132 E. 163rd Street, Gardena, CA 90248 USA Phone: 310-523-3778 or 800-376-7267 www.samsgazebos.com E-mail: info@samsgazebos.com Thank you for purchasing from SAMSGAZEBOS.COM...