Preparing Rome; Installation Preparation - Wave2wave Fiber Smart Networks ROME 500 Hardware Installation Manual

Table of Contents

Advertisement

3

Preparing ROME

3.1

Installation Preparation

Before beginning the installation of ROME equipment, please make sure to:
• Wear an ESD strap.
• Have a mechanical lifting device available, such as the one pictured, which is required to lift
and maneuver the heavy, 87 kg (191.8lbs) ROME equipment, to avoid possible bodily injury.
Page 9
Hardware
Installation Manual

Advertisement

Table of Contents
loading

Related Products for Wave2wave Fiber Smart Networks ROME 500

Table of Contents