Cissell combination sleever, bosom, body and yoke press operation/maintenance (32 pages)
Summary of Contents for Cissell LDBB
Page 1
Mighty Mite and Super Laundry Refer to Page 3 for Model Numbers Keep These Instructions for Future Reference. (If this machine changes ownership, this manual must accompany machine.) An LSG Company 831 South First Street, P.O. Box 32270 Louisville, KY 40232-2270 Phone: (502) 587-1292 Sales Fax: (502) 585-3625 Service/Parts Fax: (502) 681-1275...
Safety Information Explanation of Safety Messages Precautionary statements (“DANGER,” “WARNING,” and “CAUTION”), followed by specific instructions, are found in this manual and on machine decals. These precautions are intended for the personal safety of the operator, user, servicer, and those maintaining the machine.
Page 8
Safety Information 12. Replace worn power cords and/or loose plugs. 13. Never operate the press with any guards and/or panels removed. 14. DO NOT operate the press with missing or broken parts. 15. DO NOT bypass any safety devices. 16. Failure to install, maintain, and/or operate this press according to the manufacturer’s instructions may result in conditions which can produce bodily injury and/or property damage.
Installation Dimensions and Specifications Laundry Press Net Weights Model lbs. LDCC LDBB Electrical Requirements (Presses With Timers Only) NOTE: Presses without timers do not require electric hook-up. 115 Volt, 230 Volt/60 Hertz/1 Phase, (0.50, 0.25) full load amps 110 Volt, 220 Volt/50 Hertz/1 Phase, (0.50, 0.25) full...
Installation Required Materials NOTE: Applicable codes, ordinances, specifications and/or other governing data related to installation must be complied with. The materials listed in Table 4 MAY or MAY NOT conform to these requirements. Quantity Models with timer ONLY. Lockout type fused disconnect switch suitable for electric service connected to press (refer to wiring schematic in control box).
Location Requirements NOTE: If a forklift is used to move press, exercise care that forklift arms are inserted under frame and DO NOT CONTACT ANY OPERATING MECHANISM. Moving press to installation location while still attached to skid is recommended. However, press can be removed from skid before moving.
Installation Connecting Air Service (Refer to Figure 8) Air service connected to press must have a MINIMUM constant pressure of 80 psig (5.52 bar) and be of ample volume to meet requirements listed in data table (refer to Table 1). Air pressure should be reduced to 75 to 80 psig (5.17 to 5.52 bar) at air inlet regulator.
Connecting Electrical Service (Presses With Timers Only) The following steps outline the procedure for connecting electric service: 1. Install a suitably sized fused disconnect switch or circuit breaker as close to press as practical. 2. Remove one knockout plug from electrical connection box.
Installation Steam Check-Out Slowly open shut-off valves in steam SUPPLY and RETURN lines to prevent water hammer in steam pipes. 1. Check all steam lines for leaks. 2. Allow press to heat for 15 minutes. 3. Check head surface temperature with a pyrometer or temperature stick measuring device.
Need help?
Do you have a question about the LDBB and is the answer not in the manual?
Questions and answers