Download Print this page

BLB hydraulic BM100/1 Instruction Manual

Monoblock directional control valves

Advertisement

Quick Links

BM100
MONOBLOCK
DIRECTIONAL
CONTROL
VALVES
INSTRUCTIONS MANUAL
UPGRADE YOUR HYDRAULIC CONTROL

Advertisement

loading
Need help?

Need help?

Do you have a question about the BM100/1 and is the answer not in the manual?

Questions and answers

Summary of Contents for BLB hydraulic BM100/1

  • Page 1 BM100 MONOBLOCK DIRECTIONAL CONTROL VALVES INSTRUCTIONS MANUAL UPGRADE YOUR HYDRAULIC CONTROL...
  • Page 2 86503017 / 93011002 ITEM BM100/1 ZB GU P/MO B1/T TAR5 BM100/1 installation dimensions BM100 MONOBLOCK DIRECTIONAL CONTROL VALVES INSTRUCTIONS MANUAL...
  • Page 3 86503018 / 93011003 ITEM BM100/1 ZB GU P/MO A1/T TAR5 BM100/1 installation dimensions BM100 MONOBLOCK DIRECTIONAL CONTROL VALVES INSTRUCTIONS MANUAL...
  • Page 4 86503019/ 93011004 ITEM BM100/2 ZB GU P/MO B1/MO B1/T TAR5 BM100/2 installation dimensions BM100 MONOBLOCK DIRECTIONAL CONTROL VALVES INSTRUCTIONS MANUAL...
  • Page 5 86503021/ 93011011 ITEM BM100/2 ZB GU P/MO A1/MO A1/T TAR5 BM100/2 installation dimensions BM100 MONOBLOCK DIRECTIONAL CONTROL VALVES INSTRUCTIONS MANUAL...
  • Page 6 86503020 / 93011005 ITEM BM100/3 ZB GU P/MO A1/MO A1/MO A1/T TAR5 BM100/3 installation dimensions BM100 MONOBLOCK DIRECTIONAL CONTROL VALVES INSTRUCTIONS MANUAL...
  • Page 7: Technical Specifications

    TECHNICAL SPECIFICATIONS MAIN FEATURES Work Flow / Max Flow 90 l/min - 100 l/min Zinc plating protects against corrosion and rust Relief valve setting 140 bar Precise flow metering to accurately control actuator speed Relief valve range 100 - 250 bar Power beyond capability for easy addition of valves downstream Inlet/Outlet Ports 3/4"...
  • Page 8: Parts List

    PARTS LIST: Drawing 1 BM40 SPARE PARTS Nº PARTS PARTS Nº SUB PART SUB PART Adjusting Screw Relief Valve Kit Check Valve Handle Handle Cap Handle Cap Kit Screw O-Ring Seal Spool Kit Spool Spool Control Cap Spool Control kit Positioner Kit Screw INSTALLATION...
  • Page 9 COMPONENT THREAD Fixing Screws Before installing the product, check that it has not been 1/2” G; 7/8”-14 UNF damaged during internal transport. Connectors, Plugs 3/4” G; 1”1/16”-12 UNF Relief Valve, RVP M24 x 1,5 Step 1. Install the valve in shock and vibration free areas. While moving the valve do not cause accidental bumps or shocks. The valve must be secured with M10 screws.
  • Page 10 OPTIONAL Carry Over - CO (Power Beyond Adapter) Closed Center Plug - CCP Relief Valve Plug - RVP BM100 MONOBLOCK DIRECTIONAL CONTROL VALVES INSTRUCTIONS MANUAL...
  • Page 11 HOW TO INSTALL CARRY OVER - CO (POWER BEYOND ADAPTER) Step 1. Screw the Power Beyond Adapter into the T2 port with 27 mm hex wrench and tighten to 45 Nm. When the Power Beyond Adapter is installed a hose must be attached to the T port and run back to the tank. Failure to do this will cause the valve not to function properly.