• Installation must be performed in accordance with the requirements of CEC by
authorized personnel only.
• Cut off power supply at circuit breaker/fuse before proceeding with the installation.
• The convertion heater must be installed at a minimal distance of 6 inches (153 mm)
between the floor and adjacent walls.
• Before operating the unit, make sure that both the air inlet (bottom) and air outlet
(front) are free from obstructions.
INSTALLATION OF THE WALL BRACKET
1. Remove the unit from the bracket hooks.
2. With a pencil, mark the wall at the four anchoring points of the bracket. (Heater must
be placed at least 6 in (153 mm) above the ground).
3. Fasten the bracket to the wall, making sure it is level. When drilling into a wall or
ceiling, make sure not to damage electrical wiring and other hidden utilities.
• The wall on which the convector will be installed must be straight in order for the wall
bracket to lie perfectly flat without any pressure points. Otherwise, brackets could
malfunction.
INSTALLATION OF THE UNIT ONTO THE WALL BRACKET
1) Drill the required holes in the wall using the positioning screw holes.
2) Attach the bracket to the wall with the provided screws. (Fig.A)
3) Mount the heater to the bracket and engage the corresponding slots on the rear of
the heater. (Fig.B)