Installation
Installation
Process Overview
Step
1
Establish the CAN bus connection.
2
Connect the plug-in attachment.
3
Establish the connection to the Modbus.
4
Power supply
5
Commission the gateway.
Installing the Module
Overview of connecting cables
Connecting cables
Accessories:
CAN bus cable
8
WAGO Gateway Installation and Service
Responsibility
Contractor
Contractor
IT expert/system integrator
Electrician
IT expert/system integrator
IMPORTANT
Incorrect ambient conditions and installation locations may
impair data transfer and cause damage to the gateway.
Ambient conditions during operation
H Permissible ambient temperature: 32 to 104°F
(0 to 40°C)
H Permissible relative humidity:
– 32 to 104°F (0 to 39°C): ≤ 95%
– ≥ 104°F (≥ 40°C): ≤ 50%
H No direct sunlight
IMPORTANT
Operation by unauthorized persons may result in damage
to the system. Access to the gateway must only be
possible for authorized specialists.