Download Print this page

Mercia Garden Products 01DTSHRAX0604SDNW-V1 General Instructions Manual

Dip treated shiplap reverse apex 6x4 single door no window

Advertisement

Quick Links

General Instructions
01DTSHRAX0604SDNW-V1
DIP TREATED SHIPLAP REVERSE APEX 6X4 SINGLE DOOR NO WINDOW
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied) including a Phillips screw-
driver, Stanley knife, Wood saw, Step ladder, Hammer and a Drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
LOCATION FOR YOUR GARDEN BUILDING
A minimum of 60cm should be left around the perimeter of your garden building to allow access for maintenance,
annual treatment and to allow air ow around the building.
Where possible you should avoid placing your garden building underneath large trees to prevent the tree causing
damage to the building.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions. For the duration of heavy
or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during
excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can be
helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine
and sheltered as much as possible during rain or snow.
Once your garden building has been installed it will need to be treated as soon as possible and annually to prevent
the timber from deteriorating and to waterproof it. This is required to maintain the anti-rot guarantee.
Dip Treated buildings - Require a preservative treatment to protect against rot and decay and a waterproof treat-
ment to prevent water ingress
Pressure Treated buildings - Require a waterproof treatment to prevent water ingress
Log Cabins - Are supplied untreated and require a preservative and waterproo ng treatment.
BUILDING A BASE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to diagrams for the base
dimensions, The base should be slightly smaller than the external measurement of the building, i.e. The cladding
should overlap the base, creating a run o for water. It is also recommended that the oor be at least 25mm above
the surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens
products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or
using this product.
Please retain product label and instructions for future reference
x2
All buildings should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
For ease of assembly, you
will need a tape measure to
check dimensions of
components.
**Protim Aquatan T5 (621)**
Your building has been dip treated with Aquatan.
Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct
application of Aquatan solution and then allowed to dry.
Aquatan is a decorative nish to colour the wood, which is applied industrially to timber fence panels and
garden buildings.
Aquatan undiluted contains: boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl
sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.
REGISTER FOR YOUR
ANTI-ROT
GUARANTEE TODAY
For assistance please contact customer care on: 01636 821215
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
Screws & Nails
Bolts
To identify the
xings required
Measure
Measure
for each step use a
overall
under the
length
measuring tape.
head
PLEASE SCAN HERE:
P 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the 01DTSHRAX0604SDNW-V1 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 01DTSHRAX0604SDNW-V1

  • Page 1 It is also recommended that the oor be at least 25mm above the surrounding ground level to avoid ooding. For assistance please contact customer care on: 01636 821215 Mercia Garden Products Limited, TYPES OF BASE Sutton On Trent, - Concrete 75mm laid on top of 75mm hard-core.
  • Page 2 01DTSHRAX0604SDNW-V1 Please retain product label and instructions for future reference Overall Dimensions: Width = 1313mm Depth = 1838mm The building that you have purchased can be built Height = 2159mm as an Apex or a Reverse Apex. Also you can choose...
  • Page 3 Please retain product label and instructions for future reference Step 2 Pre Assembly Parts needed - No. 1 QTY 1 No. 4 QTY 1 Before assembling remove the transportation No. 15 QTY 3 blocks from the bottom of each panel. Place the door (No.
  • Page 4 Please retain product label and instructions for future reference Step 5 Step 3 Parts needed - No. 3 QTY 1 Parts needed - No. 2, (or 1, or 3) QTY 1 No. 3 QTY 1 Fix the end of the Plain Panel 2 (No. 3) (or **Please note: The side panels are all panel of your choice) to the already standing interchangeable and can be posititioned in...
  • Page 5 Please retain product label and instructions for future reference Step 7 Step 9 Parts needed - No. 7 QTY 2 Parts needed - No. 5 QTY 2 Place the Gable Tops (No. 7) central over the Place the Roof Panels (No. 5) on top of the end panels.
  • Page 6 Please retain product label and instructions for future reference Step 10 Step 12 Parts needed - No. 18 QTY 1 Use 40mm screws to x the roof (No. 5) Cut the felt (No. 18) into two sheets at down the sides and at the bottom being sure that the screws attach into the framing 1900mm.
  • Page 7 Please retain product label and instructions for future reference Step 13 Step 15 Parts needed - No. 9 QTY 6 Parts needed - No. 8 QTY 2 No. 11 QTY 1 Fit the Cover Trims (No. 9) over each Use 4x30mm Screws to x each beading strips (No.
  • Page 8 Please retain product label and instructions for future reference Step 16 Parts needed - No. 16 QTY 1 Screw the Pad Bolt (No. 16) on to the door (No. 4) and the retainer to the door panel (No. 1) using 10x30mm screws. Make sure that you screw into the framing behind.