Download Print this page

Engine Overhaul - New Holland TK75VA Repair Manual

Advertisement

ENGINE
Removal
DANGER
Lift and handle all heavy parts using suitable
lifting equipment.
Make sure that assemblies or parts are
supported by means of suitable slings and
hooks. Make sure that no one is standing in the
vicinity of the load to be lifted.
CAUTION
Always use appropriate tools to align fixing
holes. NEVER USE YOUR FINGERS OR HANDS.
1. Carry out operation for clutch removal.
2. Remove the rubber heat guard, 2, from the
support, 1.
3. Remove the retaining bolts, 1, and the support,
2.
SECTION 10 - - ENGINE - - CHAPTER 1

ENGINE OVERHAUL

10-35
7
8

Advertisement

loading

This manual is also suitable for:

Tk80aTk80maTk90aTk90maTk100a