Installation - ABB EV1 User Manual

Energy meter
Table of Contents

Advertisement

3.2

Installation

The connection diagram printed on the housing needs to be considered connecting the me-
ter to the mains power.
Nr.
Terminal
1
Current In L1
2
Current Out L1
3
Voltage
1
RS485 Interface B
2
RS485 Interface A
4. Connection diagram
Terminal
Nr.
1
3
4
22
23
Warning
The requirements of the net provider need to be full filled.
Selective hedges must be used according to requirements of the net providers.
Terminal-
Terminal screw
Ø[mm]
6,3*5,6
(L*W)
Pozidrive PZ1
Philips PH1
Data Interface
5,0 x 3,2
M3 Pozidrive PZ1
(L*W)
Philips PH1
Torque M [Nm]
M4
1,2 Nm< M < 1,5Nm
0,5Nm < M < 0,7Nm