Download Print this page

Installation - Oasis FV100 Series Instruction Manual

Fill valve vent

Advertisement

1. Apply anti seize to hose fittings and
torque to 70 Nm.
Recommend
Torque: 70 Nm
3. Attach vent fitting and tighten to
manufacturers instructions.
5. Attach nozzle as per manufacturers
instructions.
We reserve the right to modify product specifications without prior notice.
2. Attach main hose, tighten the connection
to the hose manufacturers instructions.
4. Tighten vent hose to the hose
manufacturers instructions.
6. Test for leaks before use, place fill valve
and nozzle in bucket of water with valve
open and look for bubbles. Use snoop or
soapy water for unsubmerged connections.
When testing the valve, ensure the
valve is held securely and opened
slowly for the first time after servicing.
If any leakage occurs then stop test
and do not use nozzle. Contact Oasis
for help.
6

Installation

Straight Valve
Test for 1 minute
FV103-INS-03 2822 © Oasis Engineering Limited

Advertisement

loading

This manual is also suitable for:

Fv103-71