Download Print this page

Oasis FV100 Series Instruction Manual

Fill valve vent

Advertisement

Quick Links

FV100 Series
FV103-71 Fill Valve Vent
Line Replacement
Instruction Manual
Failure to follow these instructions or to properly install and maintain this equipment could result in gas leak-
age, fire or explosion causing property damage and personal injury or death.
Oasis products must be installed, operated and maintained by trained and competent personnel in
accordance with all applicable local codes, rules and regulations in addition to the Oasis Instructions.
Oasis Engineering Ltd. will not be held liable in such circumstances where installation, operation and
maintenance procedures were performed by incompetent personnel resulting in improper assembly, unsafe
operation, equipment damage or personal injury.
Oasis recommends that all service technicians should watch the Product Servicing Video before attempting to
service this part.
Oasis Engineering Ltd
129 Birch Avenue, Tauranga, New Zealand.
T: +64 7 928 3808
E: info@oasisNGV.com
W: www.OasisNGV.com
Instruction Manual

Advertisement

loading

Summary of Contents for Oasis FV100 Series

  • Page 1 Oasis products must be installed, operated and maintained by trained and competent personnel in accordance with all applicable local codes, rules and regulations in addition to the Oasis Instructions. Oasis Engineering Ltd. will not be held liable in such circumstances where installation, operation and maintenance procedures were performed by incompetent personnel resulting in improper assembly, unsafe operation, equipment damage or personal injury.
  • Page 2 High pressure gas and gas equipment can cause serious harm to both infrastructure and personnel if safety precautions are not followed. Oasis recommends considering the use of the following PPE when working with high pressure along with any other site specific health and safety requirements:...
  • Page 3 1 x Vent End Cap 1 x 1/4” Vent Tube 1 x Two Piece Handle Sleeve with O-ring Assembly with Screws and Nuts The Complete Oasis Seal Kit must be used Tools Required For Servicing Sockets Torque Wrench 21mm Spanner...
  • Page 4 2. Remove and discard the two piece handle sleeve. 4. Discard complete vent assembly. 3. Remove complete vent line from the vent end cap. 21mm FV103-INS-03 2822 © Oasis Engineering Limited We reserve the right to modify product specifications without prior notice.
  • Page 5 6. Insert and tighten screws. 5. Place two piece sleeve. 7. DONE! FV103-INS-03 2822 © Oasis Engineering Limited FV103-INS-03 2822 © Oasis Engineering Limited We reserve the right to modify product specifications without prior notice. We reserve the right to modify product specifications without prior notice.
  • Page 6: Installation

    If any leakage occurs then stop test and do not use nozzle. Contact Oasis for help. FV103-INS-03 2822 © Oasis Engineering Limited We reserve the right to modify product specifications without prior notice.
  • Page 7 If any leakage occurs then stop test and do not use nozzle. Contact Oasis for help. FV103-INS-03 2822 © Oasis Engineering Limited FV103-INS-03 2822 © Oasis Engineering Limited We reserve the right to modify product specifications without prior notice.
  • Page 8 5. When filling is complete, 6. Pull nozzle sleeve back to 4. Lift up lever. shut off the lever. disengage. Move handle in one swift motion FV103-INS-03 2822 © Oasis Engineering Limited We reserve the right to modify product specifications without prior notice.

This manual is also suitable for:

Fv103-71