Post-Installation Checklist - Rinnai EX08DT Installation And Operation Manual

Direct vent wall furnace
Table of Contents

Advertisement

4.5 Post-Installation Checklist

Complete the following checklist when installation is complete. You should be able to answer YES to
each question. If you answer NO to any question, installation is not complete. Refer to the applicable
section in this manual for additional information. For assistance, contact your local dealer or
distributor, or call Rinnai Customer Care at 1-800-621-9419.
INSTALLATION LOCATION
Have you verified the unit and vent termination meet the clearance requirements?
COMBUSTION AIR AND VENTING
Have all corrosive compounds been removed from around the direct vent furnace?
Are the correct venting products for the installed model being utilized? Have you
completely followed the installation instructions in this manual?
Have you verified the vent system does not exceed the maximum length for the
number of elbows used?
GAS SUPPLY
Has a manual gas control valve been placed in the gas line to the furnace?
Have you checked the gas lines and connections for leaks?
Have you confirmed that the gas inlet pressure is within limits?
Did you confirm that the furnace is rated for the gas type supplied?
Have you verified the system is functioning correctly by connecting your manometer to
the gas pressure test port on the furnace?
Did you operate all gas appliances in the home or facility at high fire?
Did you verify that the inlet gas pressure at the furnace did not drop below that listed
on the rating plate?
ELECTRICITY
Did you confirm that the electricity is supplied from a 120 VAC, 60 Hz power source, is
in a properly grounded circuit, and turned on?
Have you confirmed that an extension cord or an adapter plug has NOT been used
with the furnace?
FINAL ITEMS
Did you install the front panel?
Have you explained to the customer the importance of not blocking the vent
termination?
Have you explained to the customer the operation of the furnace, safety guidelines,
maintenance, and warranty?
Did you leave the manual with the customer?
Does the installation conform with local codes or, in the absence of local codes, with
the National Fuel Gas Code, ANSI Z223.1/NFPA 54, or the Natural Gas and Propane
Installation Code, CSA B149.1? If installed in a manufactured home, the installation
must conform with the Manufactured Home Construction and Safety Standard, Title 24
CFR, Part 3280 and/or CAN/SCA Z240 MH Series, Mobile Homes.
EX08DT and EX11DT Installation and Operation Manual
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
27

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ex11dtRhfe-203ftaRhfe-266fta

Table of Contents